Multiple Choice
A sequential sampling plan usually consists of two to four groups.Once the auditor has considered control deviations in the first group of sampling units,he decides whether to
A) accept the assessed level of control risk as planned,without examining additional sampling units
B) stop sampling because the tolerable rate of deviation cannot be achieved
C) examine additional sampling units because sufficient information to support the assessed level of inherent risk has not been found
D) sample additional units until the tolerable rate of deviation is achieved
E) examine additional sampling units because sufficient information to support the actual level of control risk has not been found
F) both A and B
G) both B and E
H) both C and D
Correct Answer:

Verified
Correct Answer:
Verified
Q87: To determine the sample size for tests
Q88: When controls do not "work"<br>A)the auditor increases
Q89: Which of the following is not a
Q90: Which of the following is an internal
Q91: The evidence requirement in the auditing standards
Q92: When the auditor uses a nonstatistical sampling
Q93: To determine the sample size for tests
Q94: For internal controls testing,<br>A)the sample size is
Q95: A statistical sample includes<br>A)a random selection of
Q96: The auditor should consider which of the