Multiple Choice
Which of the following would BEST describe "short time schedules"?
A) The aspect of using technologies that analysts and developers are familiar with
B) The aspect of what the business side really wants the system to do
C) The aspect of how quickly the system can be developed and implemented
D) The aspect of how complex the system must be
E) The aspect of how accurate the system must be (such as medical equipment or for games)
Correct Answer:

Verified
Correct Answer:
Verified