Not Answered
Manatee Corp. has developed standard costs based on a predicted operating level of 352,000 units of production, which is 80% of capacity. Variable overhead is $281,600 at this level of activity, or $0.80 per unit. Fixed overhead is $440,000. The standard costs per unit are: Manatee actually produced 330,000 units at 75% of capacity and actual costs for the period were:
Calculate the following variances and indicate whether each variance is favorable or unfavorable:
(1) Direct labor efficiency variance:
$__________________
(2) Direct materials price variance:
$__________________
(3) Controllable overhead variance:
$__________________
Correct Answer:

Verified
Correct Answer:
Verified
Q7: The standard materials cost to produce 1
Q8: The following information comes from the records
Q22: Overhead cost variance is:<br>A) The difference between
Q49: Bok Company's output for the current period
Q92: During November, Heim Company allocated overhead to
Q110: A favorable variance for a cost means
Q120: A cost variance is the difference between
Q125: The difference between the actual cost incurred
Q145: Explain variance analysis. Describe how variance analysis
Q158: Direct materials variances are called price and