Multiple Choice
Magenta Ltd uses a job order costing system and applies factory overhead, based on direct labour hours, at a rate of $2 per direct labour hour. The data relating to production for last period is:
Direct materials $13 000
Indirect materials 2300
Direct labour (18 000 hours) 54 000
Production supervisor salaries 13 700
Maintenance costs 7000
Factory rent 8100
Factory utilities 1800
Depreciation on machinery 2200
The overhead under or overapplied after overhead has been charged to production is:
A) $900 overapplied.
B) $900 underapplied.
C) $2700 overapplied.
D) $2700 underapplied.
Correct Answer:

Verified
Correct Answer:
Verified
Q54: For 2014 The Iron Works planned the
Q55: <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB3115/.jpg" alt=" A) $25. B)
Q56: Equivalent units of production measures:<br>A) the number
Q57: Something that is not a feature of
Q58: Which account would be adjusted for the
Q60: In an 'ideal' just-in-time processing plant, the
Q61: The type of product costing system used
Q62: Which best describes the set of costs
Q63: AFD Production uses a predetermined overhead rate
Q64: It is incorrect concerning Activity-Based Costing [ABC]