Multiple Choice
According to Frame (1994) ,which of the following is not a trap that inexperienced cost estimators fall into?
A) They are too optimistic about what is needed to do the job.
B) They tend to leave components out that should be estimated.
C) They do not use a consistent estimation methodology.
D) They do not rely on historical project costs.
Correct Answer:

Verified
Correct Answer:
Verified