Multiple Choice
Note: This question requires the use of the Queueing Simulator spreadsheet in Excel. Use the queueing simulator to simulate a queueing system with 3 servers, uniform interarrival times between 20 and 50 seconds and exponential service times with an average of 75 seconds. Use a simulation run length of 10,000 arrivals. What is the point estimate for the total amount of time a customer will spend in the system?
A) 75 seconds
B) 90 seconds
C) 105 seconds
D) 120 seconds
E) 135 seconds
Correct Answer:

Verified
Correct Answer:
Verified
Q15: Analytical methods are preferable to simulation if
Q16: Managers can use simulation to obtain optimal
Q17: Random observations can be generated in Excel
Q18: Note: This question requires the use of
Q19: You have determined that waiting times at
Q21: A number is a random number between
Q22: It is always necessary to test the
Q23: Given this frequency distribution, the random
Q24: Which of the following statements about simplifying
Q25: A parameter analysis report is used to