Multiple Choice
A farmer plans to plant two crops, A and B. The cost of cultivating crop A is $40/acre, whereas that of crop B is $60/acre. The farmer has a maximum of $7,400 available for land cultivation. Each acre of crop A requires 20 labor-hours, and each acre of crop B requires 25 labor-hours. The farmer has a maximum of 3,300 labor-hours available. If he expects to make a profit of $220/acre on crop A and $280/acre on crop B, how many acres of each crop should he plant in order to maximize his profit?
A) 80 acres of crop A, 65 acres of crop B; optimal profit $44,200
B) 0 acres of crop A, 124 acres of crop B; optimal profit $34,720
C) 65 acres of crop A, 80 acres of crop B; optimal profit $36,700
D) 165 acres of crop A, 0 acres of crop B; optimal profit $36,300
Correct Answer:

Verified
Correct Answer:
Verified
Q150: Soundex produces two models of clock radios.
Q151: Perth Mining Company operates two mines for
Q152: Determine graphically the solution set for the
Q153: Use the method of corners to solve
Q154: Write a system of linear inequalities that
Q156: Determine graphically the solution set for the
Q157: Write a system of linear inequalities that
Q158: Find the optimal (maximum and/or minimum) value(s)
Q159: Determine graphically the solution set for the
Q160: Solve the linear programming problem by the