Multiple Choice
Garman observes a worker assembling peanut valves and records the data displayed in the table.During one of the cycles,the worker knocked the shaft out of the fixture and had to realign the fixtures.What is the select time for this job element?
A) less than 23 seconds
B) greater than or equal to 23 seconds but less than 26 seconds
C) greater than or equal to 26 seconds but less than 29 seconds
D) greater than or equal to 29 seconds
Correct Answer:

Verified
Correct Answer:
Verified
Q8: The performance rating factor in a time
Q14: Are time standards more useful for manufacturing
Q29: A time study analyst is attempting to
Q50: How can work standards be developed for
Q64: The key to creating a work standard
Q71: Special training is required for observers using
Q79: Why is a sampling schedule important in
Q91: Keith assembles peanut valves and the recorded
Q100: The advantage of using the predetermined data
Q105: A manager wants to determine the proportion