Multiple Choice
Keith assembles peanut valves and the recorded data is displayed in the table.What is the select time for this job element?
A) greater than or equal to 3 minutes
B) less than 3 minutes but greater than or equal to 2.7 minutes
C) less than 2.7 minutes but greater than or equal to 2.4 minutes
D) less than 2.4 minutes
Correct Answer:

Verified
Correct Answer:
Verified
Q8: The performance rating factor in a time
Q14: Are time standards more useful for manufacturing
Q30: The _ system features a database with
Q50: How can work standards be developed for
Q64: The key to creating a work standard
Q71: Special training is required for observers using
Q79: Why is a sampling schedule important in
Q88: A work sampling method is used to
Q94: Garman observes a worker assembling peanut valves
Q98: The work measurement process creates labor standards