Consider a project that consists of three consecutive activities of equal length as shown in the network diagram.The project manager would like to complete the project as quickly as possible and realizes that the diagram's logic is misleading.Instead of waiting until activity A is completed before activity B can begin,he can actually begin activity B once activity A has begun.The same reasoning holds for the relationship between activity B and activity C.The project manager decides to divide each activity in half,a technique known as "laddering".The second diagram shows the new network logic.In this diagram,activity A is divided into activity A1 and A2 where A1 must be finished before A2 can begin and before B1 can begin.The manager still isn't satisfied with the completion time of the project.Derive an expression or draw a diagram that demonstrates the fastest possible completion time of the project.
Correct Answer:

Verified
The original length of the project is A+...View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q3: Figure to accompany Table 7.1<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1252/.jpg"
Q11: Table 7.4<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1252/.jpg" alt="Table 7.4
Q14: Figure to accompany Table 7.7<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1252/.jpg"
Q53: Figure to accompany Table 7.1<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1252/.jpg"
Q61: A plan that identifies key threats to
Q67: Table 7.5<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1252/.jpg" alt="Table 7.5
Q73: Table 7.8<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1252/.jpg" alt="Table 7.8
Q91: Fig.7.2 <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1253/.jpg" alt="Fig.7.2 Which
Q99: A project has three paths.A-B-C has a
Q102: Table 7.4<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1252/.jpg" alt="Table 7.4