Multiple Choice
Table 5.3
King Supply makes four different types of plumbing fixtures: W, X, Y and Z. The contribution margins for these products are: $70 for Product W, $60 for Product X, $90 for Product Y and $100 for Product Z. Fixed overhead is estimated at $5,500 per week. The manufacture of each fixture requires four machines, Machines #1, 2, 3 and 4. Each of the machines is available for 40 hours a week and there is no setup time required when shifting from the production of one product to any other. The processing requirements to make one unit of each product are shown in the table. Weekly product demand for the next planning period has been forecasted as follows: 70 Ws, 60 Xs, 50 Ys and 30 Zs.
In the questions that follow, the traditional method refers to maximizing the contribution margin per unit for each product, and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product.
-Use the information in Table 5.3. Using the bottleneck method, what is the profit if Burdell manufactures the optimal product mix?
A) less than or equal to $10,000
B) greater than $10,000 but less than or equal to $11,000
C) greater than $11,000 but less than or equal to $12,000
D) greater than $12,000
Correct Answer:

Verified
Correct Answer:
Verified
Q108: Table 5.1<br>A company makes four products that
Q109: There are three consecutive steps in a
Q110: Figure 5.4<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1252/.jpg" alt="Figure 5.4
Q111: The first step in applying the Theory
Q112: The balance delay is the amount by
Q114: Balance the assembly line for the tasks
Q115: Figure 5.3<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1252/.jpg" alt="Figure 5.3
Q116: Table 5.3<br>King Supply makes four different types
Q117: According to the Theory of Constraints, all
Q118: Figure 5.4<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB1252/.jpg" alt="Figure 5.4