Exam 7: Structuring System Process Requirements
Exam 1: The Systems Development Environment100 Questions
Exam 2: The Origins of Software100 Questions
Exam 3: Managing the Information Systems Project97 Questions
Exam 4: Identifying and Selecting Systems Development Projects100 Questions
Exam 5: Initiating and Planning Systems Development Projects98 Questions
Exam 6: Determining System Requirements98 Questions
Exam 7: Structuring System Process Requirements100 Questions
Exam 8: Structuring System Data Requirements96 Questions
Exam 9: Designing Databases100 Questions
Exam 10: Designing Forms and Reports100 Questions
Exam 11: Designing Interfaces and Dialogues99 Questions
Exam 12: Designing Distributed and Internet Systems100 Questions
Exam 13: System Implementation95 Questions
Exam 14: Maintaining Information Systems99 Questions
Select questions type
A(n)________ diagram shows the conditional logic for the sequence of system activities needed to accomplish a business process.
(Multiple Choice)
4.7/5
(35)
________ is NOT one of the levels of details suggested by Cockburn.
(Multiple Choice)
4.7/5
(27)
DFDs do not provide notation but illustrate important concepts about the movement of data between manual and automated steps.
(True/False)
4.9/5
(36)
Both the white and ________ levels provide a summary of the use case goals.
(Multiple Choice)
4.7/5
(37)
A ________ is used in both conventions for sources/sinks and has a name that states what the external agent is,such as Customer,Teller,EPA Office,or Inventory Control System.
(Multiple Choice)
4.9/5
(26)
________ is the process of discovering discrepancies between two or more sets of DFDs or discrepancies within a single DFD.
(Multiple Choice)
4.8/5
(35)
DFDs do a very good job of representing time.On a given DFD,there is an indication of whether a data flow occurs constantly in real time,once per week,or once per year.There is also an indication of when a system would run.
(True/False)
4.8/5
(25)
________ are common in concurrent,real-time systems,in which several objects operate in parallel.
(Multiple Choice)
4.9/5
(32)
Data flow diagrams are non-versatile diagramming tools and consist of only three symbols.
(True/False)
4.9/5
(38)
A ________ in business process modeling is a way to visually encapsulate a process.
(Multiple Choice)
4.8/5
(36)
A(n)________ in business process modeling is an action that must take place for a process to be completed.
(Multiple Choice)
4.8/5
(32)
The inputs to a process must be sufficient to produce the outputs (including data placed in data stores)from the process.Thus,all outputs can be produced,and all data in inputs move somewhere: to another process or to a data store outside the process or onto a more detailed DFD showing a decomposition of that process.
(True/False)
4.9/5
(33)
According to Cockburn's template,________ are those things the system must ensure are true before the use case can start.
(Multiple Choice)
4.9/5
(32)
A data flow has multiple directions of flow between symbols.It may flow in both directions between a process and a data store to show a read before an update.
(True/False)
4.8/5
(37)
What do each of the four symbols in a DFD represent? Explain the terms used in describing the processes in the DFD.
(Essay)
4.9/5
(32)
________ DFD development recognizes that requirements determination and requirements structuring are interacting,not sequential,subphases of the analysis phase of the SDLC.
(Multiple Choice)
4.9/5
(26)
A(n)________ in business process modeling is a decision point.
(Multiple Choice)
5.0/5
(43)
Showing 21 - 40 of 100
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)