Exam 5: Initiating and Planning Systems Development Projects

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

What is an example of a project assumption?

(Multiple Choice)
4.7/5
(22)

Which option identifies the point at which benefits equal costs?

(Multiple Choice)
4.9/5
(31)

A common legal and contractual development in new application development is ________.

(Multiple Choice)
4.9/5
(35)

Which of the following is an example of a tangible benefit?

(Multiple Choice)
4.8/5
(43)

Which part of the baseline project report contains an outline of the recommended course of action?

(Multiple Choice)
4.9/5
(37)

Small projects do not have any risk.

(True/False)
4.7/5
(33)

Describe how one can manage project risk.

(Essay)
4.8/5
(32)

Why is PIP challenging?

(Multiple Choice)
4.8/5
(30)

Explain the time value of money.Incorporate terms such as discount rate and present value.

(Essay)
4.8/5
(25)

During schedule feasibility it is a good practice to not have system testing during holiday periods.

(True/False)
4.7/5
(34)

Which of the options below means the organization has the ability to build the requested system?

(Multiple Choice)
4.8/5
(30)

________ need to be managed in order to be minimized.

(Multiple Choice)
4.8/5
(35)

A(n)________ comes from an information system that can be measured monetarily.

(Multiple Choice)
4.8/5
(39)

Where do you identify the types of people needed for a project?

(Multiple Choice)
4.8/5
(35)

All of the following are part of project planning except ________.

(Multiple Choice)
4.9/5
(35)

The baseline business plan is a type of project and contains steps for overall systems development.

(True/False)
4.9/5
(37)

Failure to integrate the new system with the old system is an example of ________.

(Multiple Choice)
4.9/5
(29)

Define Project Scope Statement (PSS)and Baseline Project Plan (BPP)? Compare and contrast the two.

(Essay)
4.8/5
(29)

Which of the following is NOT an example of a project risk assessment factor?

(Multiple Choice)
4.8/5
(35)

Operational feasibility deals with project duration.

(True/False)
4.8/5
(38)
Showing 61 - 80 of 98
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)