Exam 4: Identifying and Selecting Systems Development Projects
Exam 1: The Systems Development Environment100 Questions
Exam 2: The Origins of Software100 Questions
Exam 3: Managing the Information Systems Project97 Questions
Exam 4: Identifying and Selecting Systems Development Projects100 Questions
Exam 5: Initiating and Planning Systems Development Projects98 Questions
Exam 6: Determining System Requirements98 Questions
Exam 7: Structuring System Process Requirements100 Questions
Exam 8: Structuring System Data Requirements96 Questions
Exam 9: Designing Databases100 Questions
Exam 10: Designing Forms and Reports100 Questions
Exam 11: Designing Interfaces and Dialogues99 Questions
Exam 12: Designing Distributed and Internet Systems100 Questions
Exam 13: System Implementation95 Questions
Exam 14: Maintaining Information Systems99 Questions
Select questions type
What are the unknowns when designing and building Internet applications? Provide an example of each.
(Essay)
4.8/5
(34)
Rejection of a project is the only outcome in the classifying and ranking of projects.
(True/False)
4.9/5
(38)
Which of the following is NOT a source for IS development requests?
(Multiple Choice)
4.7/5
(39)
When a steering committee chooses a project it is referred as a bottom-up source.
(True/False)
4.8/5
(36)
Information systems planning includes all of the following steps except ________.
(Multiple Choice)
4.8/5
(39)
The second step in selection of a project is reviewing the current projects and removing the ones that do not line up with strategic goals.
(True/False)
4.8/5
(23)
A development group selection method looks for projects with fewer development delays.
(True/False)
4.9/5
(40)
Define incremental commitment.Does it always result in a working system? Why or why not?
(Essay)
4.8/5
(40)
The cost of information systems has steadily decreased over time.
(True/False)
5.0/5
(38)
Which of the following is NOT a possible evaluation criteria when ranking projects?
(Multiple Choice)
4.8/5
(41)
How should one think about an organization when conducting a value chain analysis?
(Multiple Choice)
4.8/5
(28)
As an analyst,which type of project would you most likely have contact with in the beginning of your career?
(Multiple Choice)
4.9/5
(39)
List and describe the six evaluation criteria for classifying and ranking projects.
(Essay)
4.8/5
(36)
When an organization reviews their short and long term goals for development,the organization uses an IS plan to document it.
(True/False)
4.8/5
(34)
Showing 81 - 100 of 100
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)