Exam 3: Cost Behavior

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Computing unit fixed costs may result in misleading information.

(True/False)
4.9/5
(42)

Figure 3-1. Total cost = Fixed cost + (Variable Rate ´ Output) Refer to Figure 3-1.In the cost formula above which element would be the slope?

(Multiple Choice)
5.0/5
(42)

Figure 3-9. The following cost formula was developed using monthly data for a retail clothing store. Total cost = $75,620 + ($242 ´ number of customers) Refer to Figure 3-9.The term $75,620

(Multiple Choice)
4.9/5
(38)

___________________ are costs that in total vary in direct proportion to changes in output within the relevant range.

(Short Answer)
4.7/5
(35)

Andover Company makes weather balloons.The company controller wanted to calculate the fixed and variable costs associated with the maintenance costs incurred by the factory.Data for the past six months were collected. Andover Company makes weather balloons.The company controller wanted to calculate the fixed and variable costs associated with the maintenance costs incurred by the factory.Data for the past six months were collected.    Required:   Required: Andover Company makes weather balloons.The company controller wanted to calculate the fixed and variable costs associated with the maintenance costs incurred by the factory.Data for the past six months were collected.    Required:

(Essay)
4.9/5
(36)

Figure 3-3. Okafor Company manufactures skis.The management accountant wants to calculate the fixed and variable costs associated with the leasing of machinery.Data for the past four months were collected. Figure 3-3. Okafor Company manufactures skis.The management accountant wants to calculate the fixed and variable costs associated with the leasing of machinery.Data for the past four months were collected.   Refer to Figure 3-3.Using the high-low method calculate the variable rate for the lease cost Refer to Figure 3-3.Using the high-low method calculate the variable rate for the lease cost

(Multiple Choice)
4.9/5
(31)

Per-unit variable costs

(Multiple Choice)
4.8/5
(34)

The method of least squares

(Multiple Choice)
4.8/5
(34)

Using the high-low method,the variable rate of a mixed cost equals

(Multiple Choice)
4.8/5
(35)

Which of the following would probably be a variable cost at a college?

(Multiple Choice)
5.0/5
(37)

Rental expense for a warehouse is an example of a ___________ cost.

(Short Answer)
4.9/5
(31)

As output increases variable cost per unit will also increase.

(True/False)
4.9/5
(39)

Fixed costs that cannot be easily changed and typically involve a long-term contract are known as ___________________.

(Short Answer)
4.8/5
(44)

A _______________ displays a constant level of cost for a range of output and then jumps to a higher level of cost at some point.

(Short Answer)
4.9/5
(34)

The scatter-graph method

(Multiple Choice)
4.8/5
(30)

Figure 3-9. The following cost formula was developed using monthly data for a retail clothing store. Total cost = $75,620 + ($242 ´ number of customers) Refer to Figure 3-9.The term $242

(Multiple Choice)
4.7/5
(36)

Which of the following is an advantage of using the scatter-graph method over the high-low method to estimate costs?

(Multiple Choice)
4.9/5
(37)

Figure 3-8. Martin Company makes cell phones.The company controller wanted to calculate the fixed and variable costs associated with electricity use in the factory.Data for the past four months were collected. Figure 3-8. Martin Company makes cell phones.The company controller wanted to calculate the fixed and variable costs associated with electricity use in the factory.Data for the past four months were collected.   Coefficients shown by a regression program are:   Refer to Figure 3-8.Using the results of regression,what would be the total budgeted cost for electricity next month assuming that 615 machine hours are budgeted? Coefficients shown by a regression program are: Figure 3-8. Martin Company makes cell phones.The company controller wanted to calculate the fixed and variable costs associated with electricity use in the factory.Data for the past four months were collected.   Coefficients shown by a regression program are:   Refer to Figure 3-8.Using the results of regression,what would be the total budgeted cost for electricity next month assuming that 615 machine hours are budgeted? Refer to Figure 3-8.Using the results of regression,what would be the total budgeted cost for electricity next month assuming that 615 machine hours are budgeted?

(Multiple Choice)
4.8/5
(28)

Step costs

(Multiple Choice)
4.9/5
(33)

Figure 3-6. Taran Company incurred the following costs for the months of January and February. Figure 3-6. Taran Company incurred the following costs for the months of January and February.   Refer to Figure 3-6.From the information above we can assume that Refer to Figure 3-6.From the information above we can assume that

(Multiple Choice)
4.8/5
(30)
Showing 81 - 100 of 176
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)