Exam 10: Continuous Improvement

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

When interviewing someone during a root cause analysis where culpability may be an issue, the team should:

Free
(Multiple Choice)
4.8/5
(30)
Correct Answer:
Verified

B

SMART stands for:

Free
(Multiple Choice)
4.8/5
(34)
Correct Answer:
Verified

D

What is most important to accurate results from a Five Whys analysis?

Free
(Multiple Choice)
4.9/5
(42)
Correct Answer:
Verified

A

Who is required under one or more of the standards to review the Business Continuity Management System at planned intervals?

(Multiple Choice)
4.8/5
(41)

The Information Technology department intends to change the process that all employees are now required to log onto the system each day with a password. What type of change management process should they use to introduce the change?

(Multiple Choice)
4.8/5
(34)

Why should the Purchasing / Procurement personnel be trained or tasked with reporting change?

(Short Answer)
4.7/5
(42)

What is an effectiveness review and how is it conducted?

(Short Answer)
4.8/5
(42)

Under one or more of the standards, Root Cause Analysis tools do not include:

(Multiple Choice)
4.9/5
(40)

List at least five conditions that should trigger updates or changes to the Business Continuity Management System:

(Essay)
4.8/5
(39)

An Extent of Condition is a type of Root Cause Analysis.

(True/False)
4.7/5
(36)

A balanced Scorecard is an example of an un-actionable metric.

(True/False)
4.7/5
(36)

The assessment of risk is not part of the change management process.

(True/False)
4.8/5
(42)

RACI stands for :

(Multiple Choice)
4.9/5
(33)

Cascading functions are always mapped from the top down.

(True/False)
4.9/5
(41)

A RACI chart is a useful tool to manage complex corrective actions.

(True/False)
4.8/5
(30)

A nonconformity is any of the standard's requirements that were not met.

(True/False)
4.7/5
(31)

One or more of the standards require the maintenance of an audit program.

(True/False)
4.8/5
(41)

Describe the duties of the Change Facilitator:

(Short Answer)
4.8/5
(36)

Which is not a framework for developing metrics?

(Multiple Choice)
4.8/5
(42)

"Planned intervals" according to ISO 22301:

(Multiple Choice)
4.7/5
(35)
Showing 1 - 20 of 25
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)