Exam 13: Integer Linear Optimization Models
Exam 1: Introduction35 Questions
Exam 2: Descriptive Statistics65 Questions
Exam 3: Data Visualization47 Questions
Exam 4: Descriptive Data Mining44 Questions
Exam 5: Probability: an Introduction to Modeling Uncertainty36 Questions
Exam 6: Statistical Inference47 Questions
Exam 7: Linear Regression46 Questions
Exam 8: Time Series Analysis and Forecasting41 Questions
Exam 9: Predictive Data Mining38 Questions
Exam 10: Spreadsheet Models49 Questions
Exam 11: Monte Carlo Simulation41 Questions
Exam 12: Linear Optimization Models38 Questions
Exam 13: Integer Linear Optimization Models42 Questions
Exam 14: Nonlinear Optimization Models46 Questions
Exam 15: Decision Analysis40 Questions
Select questions type
The linear program that results from dropping the integer requirements for the variables in an integer linear program is known as
(Multiple Choice)
4.8/5
(22)
The optimal solution to the integer linear program will be an extreme point of the
(Multiple Choice)
4.8/5
(38)
An apparel designing company is planning to enter the women's trousers market. They are in the process of developing a product that will appeal most to customers. In an integer programming model for this problem, the available sizes of the trousers will be represented as
(Multiple Choice)
4.8/5
(35)
The __________ approach to solving integer linear optimization problems breaks the feasible region of the LP Relaxation into subregions until the subregions have integer solutions or it is determined that the solution cannot be in the subregion.
(Multiple Choice)
4.9/5
(36)
__________ constraint is a constraint requiring that two binary variables be equal and that thus are both either in or out of the solution together.
(Multiple Choice)
4.9/5
(32)
The objective function for an optimization problem is: Max 5x - 3y, with constraints x ≥ 0, y ≥ 0 and y must be an integer. x and y are the only decisions variables. This is an example of a(n)
(Multiple Choice)
4.8/5
(36)
In a production application involving a fixed setup cost and a variable cost, the use of __________ makes including the setup cost possible in a production model.
(Multiple Choice)
4.9/5
(32)
An apparel designing company is planning to enter the women's trousers market. They are in the process of developing a product that will appeal most to customers. Pink, green, and black will be __________ of the color attribute.
(Multiple Choice)
4.9/5
(39)
A binary mixed-integer programming problem in which the binary variables represent whether an activity, such as a production run, is undertaken or not is known as the
(Multiple Choice)
4.8/5
(28)
__________ analysis is a market research technique that can be used to learn how prospective buyers of a product value the product's attributes.
(Multiple Choice)
4.9/5
(28)
The __________ of a set of points is the smallest intersection of linear inequalities that contain the set of points.
(Multiple Choice)
4.8/5
(31)
The part-worth for each of the attribute levels in a conjoint analysis is determined by
(Multiple Choice)
4.8/5
(27)
Which of the following is a likely constraint on the production quantity x associated with a maximum value and a setup variable y in a fixed-cost problem?
(Multiple Choice)
4.8/5
(36)
In order to choose the best solution for implementation, practitioners usually recommend re-solving the integer linear program several times with variations in the
(Multiple Choice)
4.8/5
(36)
Coming up with a product design that will have the highest utility for a sufficient number of people to ensure sufficient sales to justify making the product is known as the ___________ problem in marketing literature.
(Multiple Choice)
4.8/5
(36)
An apparel designing company is planning to enter the women's trousers market. They are in the process of developing a product that will appeal most to customers. What category does the above objective fall under?
(Multiple Choice)
4.8/5
(31)
Which of the following is true about the sensitivity analysis for integer optimization problems?
(Multiple Choice)
4.8/5
(21)
Based upon the optimal solution and slack variables, what recommendations could you make to management?
Where
S = 1 if the store expansion project is accepted; 0 if rejected
F = 1 if the fleet expansion project is accepted; 0 if rejected
M = 1 if the equipment upgrade project is accepted; 0 if rejected
R = 1 if the market research project is accepted; 0 if rejected
and currency is in $1,000s.
Maximize
75S + 50F + 16E + 12R
s.t.
30S + 30F + 10E + 20R ≤ 85
30S + 35F + 20E + 10R ≤ 60
40S + 50F + 20E + 10R ≤ 100
65S + 55F + 20E + 10R ≤ 125
S, F, E, R = 0, 1 (binary)
(Essay)
4.8/5
(34)
In a fixed-cost problem, choosing excessively large values for the maximum production quantity will result in
(Multiple Choice)
5.0/5
(39)
Showing 21 - 40 of 42
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)