Exam 19: Statistical Methods for Quality Control

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The sample result plotted on an np control chart is _____.

Free
(Multiple Choice)
4.8/5
(36)
Correct Answer:
Verified

D

Normal or natural variations in the quality of production output that are due purely to chance are _____.

Free
(Multiple Choice)
4.8/5
(38)
Correct Answer:
Verified

A

A form of acceptance sampling in which more than one sample or stage is used is called a _____.

Free
(Multiple Choice)
4.9/5
(36)
Correct Answer:
Verified

B

In acceptance sampling, the risk of accepting a poor quality lot is known as _____.

(Multiple Choice)
4.8/5
(36)

A control chart used when the output of a process is measured in terms of the mean value of a variable such as a length, weight, temperature, and so on is a(n) _____ chart.

(Multiple Choice)
4.8/5
(30)

The sample result plotted on a p chart is the _____.

(Multiple Choice)
4.9/5
(42)

Which of the following is a statistical method used in quality control?

(Multiple Choice)
4.9/5
(35)

In practice, it is common to use the sample _____ to estimate the process _____.

(Multiple Choice)
4.9/5
(35)

Which of the following observed on a control chart suggests a process that is NOT in control?

(Multiple Choice)
4.9/5
(27)

Process control and acceptance sampling procedures are most closely related to _____.

(Multiple Choice)
4.8/5
(37)

The entire system of policies, procedures, and guidelines established by an organization to achieve and maintain quality is called _____.

(Multiple Choice)
4.8/5
(36)

The Malcolm Baldrige National Quality Award was established in _____.

(Multiple Choice)
4.7/5
(32)

Variations in the quality of production output that are due to factors such as machine tools wearing out are _____.

(Multiple Choice)
4.9/5
(29)

The general practice in quality control is to set the control chart's upper and lower control limit values equal to the variable's mean value +/- _____.

(Multiple Choice)
4.9/5
(31)

The second stage of a two-stage acceptance sampling plan is executed when the first-stage result is _____.

(Multiple Choice)
4.9/5
(30)

In contrast to Deming's philosophy, which required a major cultural change in the organization, Juran's programs were designed to improve quality by _____.

(Multiple Choice)
4.8/5
(38)

Rejecting a poor-quality lot would be a _____.

(Multiple Choice)
4.9/5
(35)

The control limits for an x-bar chart are how many standard deviations above and below the process mean?

(Multiple Choice)
4.9/5
(34)

A control chart that is used when the output of a production process is measured in terms of the proportion defective is a(n) _____ chart.

(Multiple Choice)
4.9/5
(35)

When a Motorola executive said "That evaluation is … perhaps the most cost-effective, value-added business consultation available anywhere in the world today" he was referring to _____.

(Multiple Choice)
4.8/5
(29)
Showing 1 - 20 of 51
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)