Exam 15: Lean Accounting and Productivity Measurement
Exam 1: Introduction to Cost Management154 Questions
Exam 2: Basic Cost Management Concepts191 Questions
Exam 3: Cost Behavior187 Questions
Exam 4: Activity-Based Costing202 Questions
Exam 5: Product and Service Costing: Job-Order System142 Questions
Exam 6: Process Costing176 Questions
Exam 7: Allocating Costs of Support Departments and Joint Products160 Questions
Exam 8: Budgeting for Planning and Control206 Questions
Exam 9: Standard Costing: a Functional-Based Control Approach119 Questions
Exam 10: Decentralization: Responsibility Accounting, Performance133 Questions
Exam 11: Strategic Cost Management124 Questions
Exam 12: Activity-Based Management143 Questions
Exam 13: The Balanced Scorecard: Strategic-Based Control114 Questions
Exam 14: Quality and Environmental Cost Management192 Questions
Exam 15: Lean Accounting and Productivity Measurement165 Questions
Exam 16: Cost-Volume-Profit Analysis129 Questions
Exam 17: Activity Resource Usage Model and Tactical Decision Making116 Questions
Exam 18: Pricing and Profitability Analysis150 Questions
Exam 19: Capital Investment120 Questions
Exam 20: Inventory Management: Economic Order Quantity, Jit, and the Theory of Constraints119 Questions
Select questions type
With multiple products in a value stream, unit cost will increase if
Free
(Multiple Choice)
4.7/5
(38)
Correct Answer:
B
The assessment of the amount of profit change-from the base period to the current period-attributable to productivity changes is called:
Free
(Multiple Choice)
5.0/5
(36)
Correct Answer:
A
Lean manufacturing adds value by reducing labor costs.
Free
(True/False)
4.9/5
(35)
Correct Answer:
False
An assessment of productive efficiency for all inputs combined is called __________ measurement.
(Short Answer)
4.9/5
(27)
The process of producing output efficiently, using the least quantity of inputs possible is(are) called:
(Multiple Choice)
4.9/5
(36)
The productivity ratio used as a partial operational productivity measure is calculated as follows
(Multiple Choice)
4.7/5
(40)
The departments or cells that contain all the related operations needed to produce a family of products are called __________ .
(Short Answer)
4.9/5
(43)
The assessment of productive efficiency for all inputs combined is called:
(Multiple Choice)
4.8/5
(35)
Which of the following is NOT a characteristic of a lean manufacturing system?
(Multiple Choice)
4.8/5
(43)
The following data is recorded by the Alex Company: 2018 2019 Output (units) 13,500 11,800 Input quantities: Labor (hours) 5,250 4,150 Input prices: Labor (per hour) \6 \7
What is the partial operational productivity measure for labor for 2018? (Round the answer to two decimal places.)
(Multiple Choice)
4.9/5
(39)
Value-stream costing reports the actual revenues and actual costs on a weekly basis for each value stream.
(True/False)
4.9/5
(33)
Which of the following conditions is NOT an example of technical efficiencies?
(Multiple Choice)
5.0/5
(44)
Which of the following is a reason traditional costing approaches may NOT work in a lean manufacturing environment?
(Multiple Choice)
4.9/5
(40)
At the end of 2018, Diatomic Company implemented a new labor process and redesigned its product with the expectation that input usage efficiency would increase. Now, at the end of 2019, the president of the company wants an assessment of the changes on the company's productivity. The data needed for the assessment are as follows: 2018 2019 Output 45,000 54,000 Output prices \ 10 \ 10 Materials (lbs.) 22,500 22,950 Materials unit price \ 3 \ 4 Labor (hrs.) 18,000 16,875 Labor rate per hour \ 5 \ 5 Power (kwh) 11,250 14,625 Price per kwh \ 2 \ 3 What is the partial operational measure for power for 2018?
(Multiple Choice)
4.9/5
(35)
Information about Papanicolou Corporation is as follows: 2018 2019 Output (units) 45,000 47,000 Selling price per unit \ 25 \2 5 Input quantities: Materials (pounds) 2,500 2,500 Labor (hours) 1,500 1,5255 Input prices: Materials (per pound) \ 5.00 \ 5.50 Labor (per hour) \ 7.00 \ 7.50 What is the labor productivity ratio for 2018?
(Multiple Choice)
4.7/5
(34)
Technical efficiency and allocative efficiency are the two parameters required to achieve _____.
(Multiple Choice)
4.9/5
(38)
At the end of 2018, Diatomic Company implemented a new labor process and redesigned its product with the expectation that input usage efficiency would increase. Now, at the end of 2019, the president of the company wants an assessment of the changes on the company's productivity. The data needed for the assessment are as follows: 2018 2019 Output 45,000 54,000 Output prices \ 10 \ 10 Materials (lbs.) 22,500 22,950 Materials unit price \ 3 \ 4 Labor (hrs.) 18,000 16,875 Labor rate per hour \ 5 \ 5 Power (kwh) 11,250 14,625 Price per kwh \ 2 \ 3 What is the partial operational measure for labor for 2018?
(Multiple Choice)
4.9/5
(32)
Profile measurement provides a series of profiles for all operational measures.
(True/False)
4.9/5
(38)
Using average product cost for a value stream means that individual product costs are not known. This is adequate mainly because
(Multiple Choice)
4.7/5
(35)