Exam 15: Lean Accounting and Productivity Measurement
Exam 1: Introduction to Cost Management154 Questions
Exam 2: Basic Cost Management Concepts191 Questions
Exam 3: Cost Behavior187 Questions
Exam 4: Activity-Based Costing202 Questions
Exam 5: Product and Service Costing: Job-Order System142 Questions
Exam 6: Process Costing176 Questions
Exam 7: Allocating Costs of Support Departments and Joint Products160 Questions
Exam 8: Budgeting for Planning and Control206 Questions
Exam 9: Standard Costing: a Functional-Based Control Approach119 Questions
Exam 10: Decentralization: Responsibility Accounting, Performance133 Questions
Exam 11: Strategic Cost Management124 Questions
Exam 12: Activity-Based Management143 Questions
Exam 13: The Balanced Scorecard: Strategic-Based Control114 Questions
Exam 14: Quality and Environmental Cost Management192 Questions
Exam 15: Lean Accounting and Productivity Measurement165 Questions
Exam 16: Cost-Volume-Profit Analysis129 Questions
Exam 17: Activity Resource Usage Model and Tactical Decision Making116 Questions
Exam 18: Pricing and Profitability Analysis150 Questions
Exam 19: Capital Investment120 Questions
Exam 20: Inventory Management: Economic Order Quantity, Jit, and the Theory of Constraints119 Questions
Select questions type
At the end of 2018, Diatomic Company implemented a new labor process and redesigned its product with the expectation that input usage efficiency would increase. Now, at the end of 2019, the president of the company wants an assessment of the changes on the company's productivity. The data needed for the assessment are as follows: 2019 2018 Output 45,000 54,000 Output prices \ 10 \ 10 Materials (lbs.) 22,500 22,950 Materials unit price \ 3 \4 Labor (hrs.) 18,000 16,875 Labor rate per hour \ 5 \ 5 Power (kwh) 11,250 14,625 Price per kwh \ 2 \ 3
By how much did profit change as a result of profitability changes in materials?
(Multiple Choice)
4.8/5
(42)
At the end of 2018, Diatomic Company implemented a new labor process and redesigned its product with the expectation that input usage efficiency would increase. Now, at the end of 2019, the president of the company wants an assessment of the changes on the company's productivity. The data needed for the assessment are as follows: 2019 2018 Output 45,000 54,000 Output prices \ 10 \ 10 Materials (lbs.) 22,500 22,950 Materials unit price \ 3 \4 Labor (hrs.) 18,000 16,875 Labor rate per hour \ 5 \ 5 Power (kwh) 11,250 14,625 Price per kwh \ 2 \ 3 By how much did profit change as a result of profitability changes in labor?
(Multiple Choice)
4.9/5
(31)
At the end of 2018, Diatomic Company implemented a new labor process and redesigned its product with the expectation that input usage efficiency would increase. Now, at the end of 2019, the president of the company wants an assessment of the changes on the company's productivity. The data needed for the assessment are as follows: 2018 2019 Output 45,000 54,000 Output prices \ 10 \ 10 Materials (lbs.) 22,500 22,950 Materials unit price \ 3 \ 4 Labor (hrs.) 18,000 16,875 Labor rate per hour \ 5 \ 5 Power (kwh) 11,250 14,625 Price per kwh \ 2 \ 3 What is the partial operational measure for power for 2019?
(Multiple Choice)
4.8/5
(43)
In a lean environment, many overhead costs are assigned to products as directly __________ costs.
(Short Answer)
4.9/5
(52)
At the end of 2018, Diatomic Company implemented a new labor process and redesigned its product with the expectation that input usage efficiency would increase. Now, at the end of 2019, the president of the company wants an assessment of the changes on the company's productivity. The data needed for the assessment are as follows: 2018 2019 Output 45,000 54,000 Output prices \ 10 \ 10 Materials (lbs.) 22,500 22,950 Materials unit price \ 3 \ 4 Labor (hrs.) 18,000 16,875 Labor rate per hour \ 5 \ 5 Power (kwh) 11,250 14,625 Price per kwh \ 2 \ 3 What is the partial operational measure for labor for 2019?
(Multiple Choice)
4.9/5
(37)
Employee empowerment is a major difference between traditional and lean environments.
(True/False)
4.8/5
(43)
Productivity is concerned with the efficiency of input usage in producing output.
(True/False)
4.8/5
(43)
Salvavidas Incorporated has the following departmental structure for producing its products:
A consultant designed a cellular manufacturing structure for the same product:
The times given represent the time required to process one unit of product.
Required:
a.Calculate the time required to produce a batch of 10 units using a batch processing departmental structure.
b.Calculate the time required to produce 10 units using cellular manufacturing.
c.How much manufacturing time will the cellular manufacturing structure save for a batch of 10 units?


(Essay)
4.9/5
(37)
The quantitative assessment of productivity changes is called __________ measurement.
(Short Answer)
4.8/5
(35)
The processing department can produce one unit every 5 minutes and is the last department before the finishing department. Under traditional manufacturing where a batch equals 10 units, how long will it be before the first unit in the batch can move from the processing department to the finishing department?
(Multiple Choice)
4.8/5
(37)
Information about Haulover Company is as follows: 2018 2019 Output (units) 200,000 2000,000 Input quantities: Materi als (pounds) 90,000 80,000 Labor (hours) 50,000 40,000 Input prices: Materials (per pound) \ 5 \ 6 Labor (per hour) \ 8 \ 9 What is the partial operational productivity measure for materials for 2018?
(Multiple Choice)
4.7/5
(44)
At the end of 2018, Hargreaves Company implemented a new labor process and redesigned its product with the expectation that input usage efficiency would increase. Now, at the end of 2019, the president of the company wants an assessment of the changes on the company's productivity. The data needed for the assessment are as follows: 2018 2019 Output 66,000 85,000 Output prices \ 12 \ 14 Materials (lbs.) 24,800 25,550 Materials unit price \ 5 \ 7 Labor (hrs.) 25,000 30,875 Labor rate per hour \ 9 \ 9.50 Power (kwh) 12,280 18,955 Price per kwh \ 4 \ 4.50
What is the partial operational measure for materials for 2018? (Round the answer to two decimal places.)
(Multiple Choice)
4.7/5
(37)
Information about Beagle Corporation is as follows: 2018 2019 Output (units) 59,000 63,000 Selling price per unit \ 32 \ 36 Input quantities: Materials (pounds) 3,100 3,500 Labor (hours) 1,800 1,925 Input prices: Materials (per pound) \ 8.00 \ 9.50 Labor (per hour) \ 9.00 \ 10.00 What is the materials productivity ratio for 2018? (Round the answer to two decimal places.)
(Multiple Choice)
4.8/5
(30)
The following information relates to Cranmore Manufacturing: To produce a unit of product: Cutting department 5 minutes per unit Wel ding department 8 minutes per unit Polishing department 3 minutes per unit Finishing department 4 minutes per unit There is a wait time of 5 minutes before the cutting department begins a batch, 15 minutes between the cutting and welding departments, a move and pre-wait between welding and polishing of 12 minutes, and a move and pre-wait between the polishing and finishing departments of 8 minutes.
What is the cycle time of operation?
(Multiple Choice)
4.8/5
(46)
The difference between the total profit change and the profit-linked productivity change is called the __________ component.
(Short Answer)
4.9/5
(38)
Changes in product-costing and operational control approaches are crucial to a value-stream based lean manufacturing system.
(True/False)
4.8/5
(38)
Showing 101 - 120 of 165
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)