"Schedule feasibility" refers to whether or not computer vendors can provide bids in a timely manner.

(True/False)
4.7/5
(37)

All of these are advantages of prototyping except:

(Multiple Choice)
4.9/5
(35)

Within the context of systems studies, a point-scoring system is commonly used:

(Multiple Choice)
4.8/5
(38)

Which of these is not generally a reason to outsource:

(Multiple Choice)
4.7/5
(35)

Which of these is not a stage in the systems development life cycle?

(Multiple Choice)
4.8/5
(34)

The totality of computer systems in a firm is called its:

(Multiple Choice)
4.7/5
(39)

During systems implementation, "converting computer files" is only necessary if the files are currently in manual formats.

(True/False)
4.7/5
(33)

PERT is an acronym for "Project Expert and Resource Technique."

(True/False)
4.9/5
(35)

A possible advantage of outsourcing is that it frees corporate assets for other projects.

(True/False)
4.8/5
(28)

"Cost" is rarely a concern in developing information system.What is more important is that the anticipated benefits of a new AIS exceed its costs.

(True/False)
4.8/5
(34)

All of these are common selection criteria for choosing a final software package from a vendor except:

(Multiple Choice)
4.8/5
(39)

A student fails a course at his university.Which of these is most likely to be the cause of the problem and not a symptom of this problem?

(Multiple Choice)
4.8/5
(44)

One thing that can go wrong during systems implementation is implementing a system that has not been completely tested.

(True/False)
4.7/5
(28)

When considering the design of a new system, four types of feasibility concerns are (1)technical feasibility, (2)operational feasibility, (3)schedule feasibility, and (4)legal feasibility.

(True/False)
4.8/5
(41)

Knowledge process outsourcing (KPO)mainly refers to outsourcing to offshore companies in places where labor is cheap.

(True/False)
4.9/5
(39)

The information needs of operating managers are normally easier to determine than those of top managers because their decision making tends to be better defined and narrower in scope.

(True/False)
4.8/5
(27)

For a system to be totally feasible, all feasibility areas must be considered in the process.

(True/False)
4.8/5
(30)

When designing a computer?based information system, the initial step in the systems design process is to identify:

(Multiple Choice)
5.0/5
(43)

An example of a soft-copy report is one that identifies slow-moving items where demand is soft.

(True/False)
4.8/5
(37)

An intensive investigation of a company's present information system in order to discover systems weaknesses is termed a:

(Multiple Choice)
4.8/5
(33)