Exam 15: Just-In-Time Manufacturing and Lean Production

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

Suppliers benefit from partnering with their customers with:

(Multiple Choice)
4.9/5
(30)

The JIT system:

(Multiple Choice)
4.8/5
(32)

Uniform plant loading means that the work done at each workstation should take about the same time.

(True/False)
5.0/5
(33)

Production problems can include:

(Multiple Choice)
4.8/5
(39)

The developers of the JIT concepts utilized a simple card system called ________.

(Multiple Choice)
4.8/5
(32)

MRP plans the material flow based on the bill of material, lead times, and available inventory.

(True/False)
4.8/5
(33)

MRP is often called a push system meaning that the material needs are calculated ahead of time.

(True/False)
4.9/5
(28)

The benefits to the buyer of partnering with suppliers include:

(Multiple Choice)
4.9/5
(30)

Discuss process flexibility and its importance to the JIT environment.

(Essay)
5.0/5
(31)

The following MPS summary scheduled is leveled for capacity. Using the following table, level the schedule for material as well. Week 1 2 3 4 5 Model A 800 1600 1600 Model B 600 1600 800 Model C 1000 Total 1600 1600 1600 1600 1600

(Essay)
4.7/5
(31)
Showing 21 - 30 of 30
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)