Exam 15: Just-In-Time Manufacturing and Lean Production
Exam 1: Introduction to Materials Management30 Questions
Exam 2: Production Planning System30 Questions
Exam 3: Master Scheduling29 Questions
Exam 4: Material Requirements Planning30 Questions
Exam 5: Capacity Management30 Questions
Exam 6: Production Activity Control29 Questions
Exam 7: Purchasing30 Questions
Exam 8: Forecasting30 Questions
Exam 9: Inventory Fundamentals30 Questions
Exam 10: Order Quantities26 Questions
Exam 11: Independent Demand Ordering Systems29 Questions
Exam 12: Physical Inventory and Warehouse Management30 Questions
Exam 13: Physical Distribution30 Questions
Exam 14: Products and Processes30 Questions
Exam 15: Just-In-Time Manufacturing and Lean Production30 Questions
Exam 16: Total Quality Management30 Questions
Select questions type
Suppliers benefit from partnering with their customers with:
(Multiple Choice)
4.9/5
(30)
Uniform plant loading means that the work done at each workstation should take about the same time.
(True/False)
5.0/5
(33)
The developers of the JIT concepts utilized a simple card system called ________.
(Multiple Choice)
4.8/5
(32)
MRP plans the material flow based on the bill of material, lead times, and available inventory.
(True/False)
4.8/5
(33)
MRP is often called a push system meaning that the material needs are calculated ahead of time.
(True/False)
4.9/5
(28)
The benefits to the buyer of partnering with suppliers include:
(Multiple Choice)
4.9/5
(30)
Discuss process flexibility and its importance to the JIT environment.
(Essay)
5.0/5
(31)
The following MPS summary scheduled is leveled for capacity. Using the following table, level the schedule for material as well. Week 1 2 3 4 5 Model A 800 1600 1600 Model B 600 1600 800 Model C 1000 Total 1600 1600 1600 1600 1600
(Essay)
4.7/5
(31)
Showing 21 - 30 of 30
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)