Exam 3: Design of Products and Services
Exam 1: Introduction78 Questions
Exam 2: Strategy56 Questions
Exam 3: Design of Products and Services71 Questions
Exam 4: Projects108 Questions
Exam 5: Strategic Capacity Management69 Questions
Exam 6: Learning Curves57 Questions
Exam 7: Manufacturing Processes52 Questions
Exam 8: Facility Layout60 Questions
Exam 9: Service Processes71 Questions
Exam 10: Waiting Line Analysis and Simulation77 Questions
Exam 11: Process Design and Analysis67 Questions
Exam 12: Six Sigma Quality70 Questions
Exam 13: Statistical Quality Control64 Questions
Exam 14: Lean Supply Chains85 Questions
Exam 15: Logistics, Distribution, and Transportation61 Questions
Exam 16: Global Sourcing and Procurement73 Questions
Exam 17: The Internet of Things and Erp40 Questions
Exam 18: Forecasting102 Questions
Exam 19: Sales and Operations Planning61 Questions
Exam 20: Inventory Management104 Questions
Exam 21: Material Requirements Planning91 Questions
Exam 22: Workcenter Scheduling125 Questions
Select questions type
A contract manufacturer is an organization capable of manufacturing and/or purchasing all of the components needed to produce a finished product or device.
(True/False)
4.9/5
(36)
Ultimate value is the measure of the value of a product in the marketplace.
(True/False)
5.0/5
(34)
A key decision point in the generic development process during "Phase 4: Testing and Refinement" is concept approval.
(True/False)
4.9/5
(34)
Which of the following is primarily used to help design products that will connect product attributes with customer desires?
(Multiple Choice)
4.8/5
(32)
In a concurrent engineering approach to product design and development, an integration team ensures that various parts of the product are compatible with the needs of the target customer.
(True/False)
4.9/5
(38)
The main purpose of concurrent engineering is to improve product quality.
(True/False)
4.8/5
(33)
An important issue when developing a new service or changing an existing one is the question of how different the new service is compared to the current services offered by the firm. Which of the following is not a general factor to consider when determining this?
(Multiple Choice)
4.8/5
(28)
Target customers are specified during "Phase 0: Planning" of the generic product development process.
(True/False)
4.9/5
(40)
Quality function deployment involves listening to customers to determine the characteristics of a superior product.
(True/False)
4.9/5
(32)
A key decision point in the generic development process during "Phase 1: Concept Development" is project approval.
(True/False)
4.8/5
(30)
In the generic product development process, collecting customer needs is accomplished during Phase 0 (planning).
(True/False)
4.9/5
(31)
The most basic categories of cash flow for a typical new product do not include:
(Multiple Choice)
4.8/5
(37)
Which of the following is a characteristic of concurrent engineering?
(Multiple Choice)
4.7/5
(36)
The purpose of value analysis/value engineering (VA/VE) is to:
(Multiple Choice)
4.9/5
(31)
Which of the following is not a typical phases of product development?
(Multiple Choice)
4.9/5
(27)
One of the methodologies that can aid in designing a new product for customers is a house of quality matrix.
(True/False)
4.7/5
(38)
Showing 41 - 60 of 71
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)