Exam 19: Troubleshooting
Exam 1: Transformers and Power Supplies10 Questions
Exam 2: Fuses, Disconnect Switches, and Circuit Breakers10 Questions
Exam 3: Control Units for Switching and Communication8 Questions
Exam 4: Relays10 Questions
Exam 5: Solenoids9 Questions
Exam 6: Types of Control10 Questions
Exam 7: Motion Control Devices8 Questions
Exam 8: Pressure Control10 Questions
Exam 9: Temperature Control10 Questions
Exam 10: Time Control10 Questions
Exam 11: Count Control9 Questions
Exam 12: Control Circuits10 Questions
Exam 13: Motors and Drives10 Questions
Exam 14: Motor Starters10 Questions
Exam 15: Introduction to Programmable Control10 Questions
Exam 16: Industrial Data Communications10 Questions
Exam 17: Quality Control10 Questions
Exam 18: Safety10 Questions
Exam 19: Troubleshooting10 Questions
Exam 20: Designing Control Systems for Easy Maintenance10 Questions
Select questions type
Effective troubleshooting begins with replacing components, one at a time.
Free
(True/False)
4.7/5
(35)
Correct Answer:
False
Opens in a common line may be the result of an omitted ____________________ on the terminal block.
Free
(Short Answer)
4.8/5
(34)
Correct Answer:
jumper
When measuring an AC signal, a DMM will display the ____ value of the signal.
Free
(Multiple Choice)
4.8/5
(40)
Correct Answer:
D
Another problem that may occur with a double-pole, double-break contact is ____________________, that is, one contact of the double break travels across to the opposite contact, but the other remains in its original position.
(Short Answer)
4.7/5
(42)
In cases in which electrical heating is used, low voltage will cause the heat to be reduced by ____________________ of the voltage.
(Short Answer)
4.7/5
(47)
The use of ____ in place of solid conductors has, in general, improved the loose connection problem.
(Multiple Choice)
4.8/5
(37)
Success in troubleshooting results from the ability to segregate the problem area from other unrelated circuitry.
(True/False)
4.8/5
(36)
____ is one result of low voltage that may not be noticed immediately in the functioning of a machine.
(Multiple Choice)
4.8/5
(28)
Control circuits, relay or PLC, should have ____ to identify logic and actuator status.
(Multiple Choice)
4.7/5
(47)
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)