Exam 12: Control Circuits
Exam 1: Transformers and Power Supplies10 Questions
Exam 2: Fuses, Disconnect Switches, and Circuit Breakers10 Questions
Exam 3: Control Units for Switching and Communication8 Questions
Exam 4: Relays10 Questions
Exam 5: Solenoids9 Questions
Exam 6: Types of Control10 Questions
Exam 7: Motion Control Devices8 Questions
Exam 8: Pressure Control10 Questions
Exam 9: Temperature Control10 Questions
Exam 10: Time Control10 Questions
Exam 11: Count Control9 Questions
Exam 12: Control Circuits10 Questions
Exam 13: Motors and Drives10 Questions
Exam 14: Motor Starters10 Questions
Exam 15: Introduction to Programmable Control10 Questions
Exam 16: Industrial Data Communications10 Questions
Exam 17: Quality Control10 Questions
Exam 18: Safety10 Questions
Exam 19: Troubleshooting10 Questions
Exam 20: Designing Control Systems for Easy Maintenance10 Questions
Select questions type
The decision makers are used to perform the work that must occur as the machine sequences through its operations.
Free
(True/False)
4.9/5
(36)
Correct Answer:
False
In a sequence bar chart, the ____________________ devices are listed in the sequential order in which they are operated throughout the cycle.
Free
(Short Answer)
4.9/5
(37)
Correct Answer:
input
A sequence bar chart is created by listing the outputs and decision makers in rows at the ____________________ side of the chart.
Free
(Short Answer)
4.8/5
(41)
Correct Answer:
left
left-hand
As an input device, a pyrometer would provide information about pressure.
(True/False)
4.8/5
(42)
A ____ chart is a pictorial representation that explains the functioning of the control components from input to output.
(Multiple Choice)
4.8/5
(43)
Input devices gather ____________________ from the operator, the machine, or the process.
(Short Answer)
5.0/5
(45)
As relay-based control systems became obsolete, ____ control systems took their place.
(Multiple Choice)
4.8/5
(33)