Exam 6: Resource Planning Systems
Exam 1: Introduction to Supply Chain Management49 Questions
Exam 2: Purchasing Management51 Questions
Exam 3: Creating and Managing Supplier Relationships49 Questions
Exam 4: Ethical and Sustainable Sourcing44 Questions
Exam 5: Demand Forecasting52 Questions
Exam 6: Resource Planning Systems48 Questions
Exam 7: Inventory Management47 Questions
Exam 8: Process Management: Lean and Six Sigma in the Supply Chain51 Questions
Exam 9: Domestic Usand Global Logistics47 Questions
Exam 10: Customer Relationship Management45 Questions
Exam 11: Global Location Decisions49 Questions
Exam 12: Service Response Logistics47 Questions
Exam 13: Supply Chain Process Integration46 Questions
Exam 14: Performance Measurement Along the Supply Chain45 Questions
Select questions type
Complete the Projected on hand inventory Row
Gross Requirements 15 40 40 10 Schedule Receipts 50 Projected on Hand Inventory \nobreakspace\nobreakspace\nobreakspace\nobreakspace\nobreakspace\nobreakspace\nobreakspace\nobreakspace\nobreakspace\nobreakspace\nobreakspace\nobreakspace\nobreakspace\nobreakspace\nobreakspace\nobreakspace\nobreakspace|\nobreakspace\nobreakspace 40 Net Requirements Planned Order Releases 25
Q = 25; LT = 3; SS = 10
Free
(Essay)
4.7/5
(38)
Correct Answer:
Q = 25; LT = 3; SS = 10
Which of the following MRP terms represents the parts demanded by a parent?
Free
(Multiple Choice)
4.8/5
(24)
Correct Answer:
B
MRP is the production planning system intended to develop long-range plans (more than a year away) concerning product families manufactured by the organization.
Free
(True/False)
4.9/5
(38)
Correct Answer:
False
In a bill of materials, items at which level are independent demand items?
(Multiple Choice)
4.8/5
(36)
Organizations that choose to implement the best applications or modules for each of the different functional departments associated with the supply chain versus choosing to implement one single system with all of the desired applications from a single vendor is said to have chosen a(n):
(Multiple Choice)
4.9/5
(34)
Which of the following is an engineering document that shows an inclusive listing of all the component parts and assemblies making up the final product?
(Multiple Choice)
4.8/5
(31)
MRP systems are simply a more modern version of the ERP systems of the 1980's.
(True/False)
4.7/5
(32)
Which of the following is considered an advantage/benefit of utilizing an ERP system?
(Multiple Choice)
4.9/5
(38)
The process of converting a parent item's planned order releases into component gross requirements is referred to as the ERP Implosion.
(True/False)
4.8/5
(41)
Two reasons ERP implementations have been known to fail include: lack of employee training on the new ERP system and lack of adequate resources to support these complex and time consuming implementations.
(True/False)
4.8/5
(38)
The goal of resource planning is to minimize the discrepancy between capacity and:
(Multiple Choice)
4.9/5
(33)
Lack of communication between the implementing firm and its ERP software provider can become a major hindrance for a successful implementation.
(True/False)
4.9/5
(33)
To check the feasibility of the Master Production Schedule, one would look to:
(Multiple Choice)
4.8/5
(37)
Which of the following seeks to develop short range plans seeking to effectively and efficiently manage components and/or subassemblies over time period of few days to a few weeks?
(Multiple Choice)
4.8/5
(38)
Which number should be placed in the spot presently filled with the X? Item ABC-Level 1
1
2
3
4
Gross Requirements
20
20
50
30
Schedule Receipts
25
Projected on Hand Inventory
30
10
15
40
10
Net Requirements
Planned Order Releases
X
Q = 25; LT = 2; SS = 10
(Multiple Choice)
4.9/5
(37)
A Mixed Production Strategy uses a blend of chase and level strategies by striving to maintain a stable core workforce while using other means like temporary workers to manage short-term high demand.
(True/False)
4.9/5
(44)
An MRP system has a subassembly with a lot size of 100 units.In terms of filling future requirements, this would mean that planned order releases for the subassembly would always have to be exactly 100 units.
(True/False)
4.8/5
(30)
Showing 1 - 20 of 48
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)