Exam 2: Risk Based Inspection
Exam 1: Corrosion and Materials452 Questions
Exam 2: Risk Based Inspection134 Questions
Select questions type
Some failures have potentially serious consequences, but if the probability of the incident is low, then
(Multiple Choice)
4.9/5
(39)
The program that is focused on understanding failure modes, addressing the modes and therefore improving the reliability of equipment and process facilities.
(Multiple Choice)
4.9/5
(38)
FILL BLANK RP 580 is intended to promote consistency and quality in identification, assessment and management of risks pertaining to ____________, which could lead to _______________
(Short Answer)
4.9/5
(31)
In process plants are established to detect and evaluate deterioration due to in service operation.
(Multiple Choice)
4.9/5
(43)
Reliability efforts, such as reliability centered maintenance (REM), can be linked with RBI, resulting in an integrated program to
(Multiple Choice)
4.9/5
(35)
Quantitative risk analysis logic models generally consist of ___________ and ______
(Multiple Choice)
4.8/5
(40)
___________ is usually not the primary objective of a RBI assessment, but it is frequently a side effect of optimization.
(Multiple Choice)
4.7/5
(40)
The RBI program for environmental consequences, typically focuses
(Multiple Choice)
4.8/5
(39)
____________deals with total risk than with risk involve only with the equipment.
(Multiple Choice)
4.7/5
(40)
Who can provide useful input (such as the spectrum of process conditions, injection points etc.) To aid materials specialists in the identification of deterioration mechanisms and rates
(Multiple Choice)
4.8/5
(34)
Method used for consequence analysis should demonstrate the ability to provide
(Multiple Choice)
4.7/5
(34)
The following types of pressurized equipment and associated components covered by RBI
(Multiple Choice)
4.8/5
(33)
The type of failure mode that likely to occur due to pitting
(Multiple Choice)
4.8/5
(31)
______________ delineate initiating events and combinations of system
(Multiple Choice)
4.8/5
(32)
Following is the unit of measure of consequence that is least developed among those currently used for RBI assessment.
(Multiple Choice)
4.9/5
(44)
Provides a basis for risk evaluation, risk mitigation and risk acceptance
(Multiple Choice)
4.8/5
(33)