Exam 2: Risk Based Inspection

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

RBI is based on

(Multiple Choice)
4.8/5
(41)

Probability side of the risk equation is normally managed by

(Multiple Choice)
4.8/5
(41)

Through __________________, inspection activities are focused on higher risk items and away from lower risk items.

(Multiple Choice)
4.8/5
(42)

Following will cover the functional failures except

(Multiple Choice)
4.8/5
(34)

Consequence is always __________ for safety aspects

(Multiple Choice)
4.7/5
(29)

_________________curves are referred for the deterioration mechanism for carbon and low ally steel materials.

(Multiple Choice)
4.8/5
(46)

Potential hazards identified in a PHA will often affect the

(Multiple Choice)
4.8/5
(42)

_____________ depict ways in which the system failures rep- resented in the event trees can occur.

(Multiple Choice)
5.0/5
(25)

The suitability and current condition of the equipment within the current operating envelope will determine the ______________ of the equipment from one or more deterioration mechanisms.

(Multiple Choice)
4.8/5
(31)

Act of mitigating a known risk to a lower level of risk.

(Multiple Choice)
4.7/5
(41)

RBI may include methodologies to assess the effectiveness of the management systems in maintaining

(Multiple Choice)
4.7/5
(35)

Results of quantitative consequence analysis are usually expressed in

(Multiple Choice)
4.8/5
(38)

Equipment reliability is especially important if leaks can be caused by

(Multiple Choice)
4.9/5
(39)

Occurrence of a particular set of circumstances, is called an

(Multiple Choice)
4.8/5
(44)

FILL BLANK _________ produces inspection and maintenance plans for equipment that should be implemented to provide ____________

(Short Answer)
4.8/5
(28)

If a QRA has been prepared for a process unit, the analysis can borrow extensively from this effort.

(Multiple Choice)
4.7/5
(33)

Deterioration rates can be expressed in terms of

(Multiple Choice)
4.8/5
(28)

Qualitative consequence analysis of failure can be estimated separately for each unit, system, equipment group or individual equipment item.

(Multiple Choice)
4.9/5
(38)

Risk presented in qualitative risk analysis as

(Multiple Choice)
4.8/5
(36)

RBI requires the commitment and cooperation of the

(Multiple Choice)
4.9/5
(37)
Showing 41 - 60 of 134
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)