Exam 4: Electrical Installations: Fault Diagnosis and Rectifi Cation
Exam 1: Health and Safety in Building Services Engineering28 Questions
Exam 2: Understand the Fundamental Principles and Requirements of Environmental Technology Systems39 Questions
Exam 3: Principles of Electrical Science57 Questions
Exam 4: Electrical Installations: Fault Diagnosis and Rectifi Cation24 Questions
Exam 5: Electrical Installations: Inspection, Testing and Commissioning15 Questions
Select questions type
Before beginning work on a 'live' circuit or piece of equipment you should:
Free
(Multiple Choice)
5.0/5
(35)
Correct Answer:
C,D
For electrical test results to be valid the test instruments used:
Free
(Multiple Choice)
4.8/5
(36)
Correct Answer:
B
The test required by the IET Regulations to ascertain that the CPC is correctly connected is called:
(Multiple Choice)
4.8/5
(32)
'To ensure that the accessories and equipment within a building work as they were intended to work' is one definition of the purpose of:
(Multiple Choice)
4.8/5
(41)
Which hand tools would you use for removing cable insulation?
(Multiple Choice)
4.9/5
(34)
When testing a 230 V installation an insulation resistance tester must supply a voltage of:
(Multiple Choice)
4.8/5
(37)
The value of a satisfactory insulation resistance test on each final circuit of a 230 V installation must be:
(Multiple Choice)
4.8/5
(43)
Under the Health and Safety at Work Act an employee is responsible for:
(Multiple Choice)
4.8/5
(39)
Under the Health and Safety at Work Act an employer is responsible for:
(Multiple Choice)
4.8/5
(42)
The Electricity at Work Regulations absolutely forbid the following work activity:
(Multiple Choice)
4.9/5
(43)
Which hand tools would you use for terminating conductors in a junction box?
(Multiple Choice)
4.8/5
(32)
The maximum inspection and re-test period for a domestic electrical installation is:
(Multiple Choice)
4.9/5
(35)
Instrument calibration certificates are usually valid for a period of:
(Multiple Choice)
4.9/5
(38)
The Electricity at Work Regulations tell us that 'we must ensure the disconnection and separation of electrical equipment from every source of supply and the separation must be secure'. A procedure to comply with this regulation is called:
(Multiple Choice)
4.9/5
(41)
When making a test to determine the presence or absence of a voltage, the HSE recommends that for our own safety we should use:
(Multiple Choice)
4.8/5
(38)
Which hand tools would you use to cut across a floorboard before lifting?
(Multiple Choice)
4.9/5
(31)
Showing 1 - 20 of 24
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)