Exam 3: Principles of Electrical Science
Exam 1: Health and Safety in Building Services Engineering28 Questions
Exam 2: Understand the Fundamental Principles and Requirements of Environmental Technology Systems39 Questions
Exam 3: Principles of Electrical Science57 Questions
Exam 4: Electrical Installations: Fault Diagnosis and Rectifi Cation24 Questions
Exam 5: Electrical Installations: Inspection, Testing and Commissioning15 Questions
Select questions type
The connection of the exposed conductive parts of an installation to the main protective earthing terminal of the installation is one definition of:
Free
(Multiple Choice)
4.8/5
(31)
Correct Answer:
A
An electrical cable is made up of three parts which are:
Free
(Multiple Choice)
4.9/5
(35)
Correct Answer:
B
The protection provided by insulating live parts is called:
Free
(Multiple Choice)
4.8/5
(38)
Correct Answer:
B
The conduit and trunking parts of the electrical installation are:
(Multiple Choice)
4.9/5
(50)
A PVC insulated and sheathed wiring system would be suitable for the following type of installation:
(Multiple Choice)
4.8/5
(38)
Electricity is distributed from the local substations by underground cables at:
(Multiple Choice)
4.8/5
(36)
A steel trunking installation would be suitable for the following type of installation:
(Multiple Choice)
4.8/5
(36)
Which of the following fixing methods would be suitable for securing a heavy electric motor to a concrete bed?
(Multiple Choice)
4.9/5
(30)
An appropriate wiring system for a three-phase industrial installation would be:
(Multiple Choice)
4.9/5
(34)
An appropriate wiring method for an underground feed to a remote building would be a:
(Multiple Choice)
4.8/5
(46)
A diagram which shows the detailed connections between individual items of equipment is a description of a:
(Multiple Choice)
4.8/5
(29)
A protective conductor connecting exposed and extraneous parts together is one definition of:
(Multiple Choice)
4.8/5
(51)
A PVC conduit installation would be suitable for the following type of installation:
(Multiple Choice)
4.7/5
(42)
The cables suspended from the transmission towers of the National Grid network are made from:
(Multiple Choice)
4.9/5
(35)
Transmission of electricity on the National Grid network takes place at:
(Multiple Choice)
4.9/5
(50)
The act of connecting the exposed conductive parts of the installation to the main earthing terminal of the installation is called:
(Multiple Choice)
4.9/5
(31)
The weakest link in the circuit designed to melt when an over-current flows is one definition of:
(Multiple Choice)
4.9/5
(35)
The phase current of a delta-connected load is 100 A. The line current will be:
(Multiple Choice)
4.8/5
(43)
Which of the following fixing methods would be suitable for holding a medium-weight load onto a brick wall?
(Multiple Choice)
4.9/5
(41)
A steel conduit installation would be suitable for the following type of installation:
(Multiple Choice)
4.8/5
(36)