Exam 3: Principles of Electrical Science

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The act of linking together the exposed and extraneous metal parts is called:

(Multiple Choice)
5.0/5
(26)

An appropriate wiring method for a high-temperature installation in a boiler house is:

(Multiple Choice)
4.7/5
(39)

A load connected to phase and neutral of a star-connected three-phase four-wire supply system from the local substation would have a voltage of:

(Multiple Choice)
4.7/5
(32)

Which of the following fixing methods would be suitable for holding a PVC insulated and sheathed cable onto a wood surface such as a ceiling joist?

(Multiple Choice)
4.9/5
(29)

A diagram which shows most clearly how a circuit works, with all items represented by graphical symbols, is a description of a:

(Multiple Choice)
4.8/5
(36)

The metalwork of the electrical installation is called:

(Multiple Choice)
4.8/5
(25)

An electrical cable is made up of three parts which are:

(Multiple Choice)
4.8/5
(41)

The phase current of a star-connected load is 100 A. The line current will be:

(Multiple Choice)
4.9/5
(38)

The phase voltage of a star-connected load is 100 V. The line voltage will be:

(Multiple Choice)
5.0/5
(37)

An appropriate wiring method for a domestic installation would be a:

(Multiple Choice)
4.8/5
(37)

A scale drawing which shows the actual position of the electrical equipment upon completion of the contract is called a:

(Multiple Choice)
4.7/5
(29)

An appropriate wiring method for a domestic installation would be a:

(Multiple Choice)
4.9/5
(38)

An appropriate wiring method for an underground feed to a remote building would be a:

(Multiple Choice)
4.8/5
(41)

A scale drawing which shows the original intention for the position of electrical equipment is called a:

(Multiple Choice)
4.8/5
(27)

A scale drawing showing the position of equipment by graphical symbols is a description of a:

(Multiple Choice)
4.9/5
(38)

The protection provided by protective equipotential bonding and automatic disconnection of the supply is called:

(Multiple Choice)
4.9/5
(32)

The metalwork of the building and other service pipes is called:

(Multiple Choice)
4.9/5
(34)

To ensure the effective operation of the over-current protective devices, the earth fault loop path must have:

(Multiple Choice)
4.8/5
(35)

According to IET Regulation 411.3.2.2 all final circuits not exceeding 32 A in a building supplied with a 230 V TN supply shall have a maximum disconnection time not exceeding:

(Multiple Choice)
4.8/5
(30)

A protective conductor connecting exposed conductive parts of equipment to the main earthing terminal is one definition of:

(Multiple Choice)
4.9/5
(35)
Showing 21 - 40 of 57
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)