Exam 2: Construction Contracts, Planning Methods, and Safety Measures

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

An activity is represented by

Free
(Multiple Choice)
4.7/5
(40)
Correct Answer:
Verified

A

Departmental execution is suitable for small jobs

Free
(Multiple Choice)
4.8/5
(36)
Correct Answer:
Verified

A

PERT requires

Free
(Multiple Choice)
4.8/5
(32)
Correct Answer:
Verified

C

Carelessness is the cause of an accident that can be attributed to

(Multiple Choice)
4.9/5
(34)

A bar chart is drawn for

(Multiple Choice)
4.8/5
(30)

PERT is

(Multiple Choice)
4.9/5
(36)

CPM requires

(Multiple Choice)
4.9/5
(46)

Bar chart is suitable for

(Multiple Choice)
4.8/5
(41)

Contract system is suitable for big projects

(Multiple Choice)
4.8/5
(39)

Bar chart is also known as

(Multiple Choice)
4.8/5
(41)

Bar chart is very popular because

(Multiple Choice)
4.8/5
(38)

Specialized work needs departmental execution

(Multiple Choice)
4.9/5
(36)

An activity requires

(Multiple Choice)
4.7/5
(38)

Which of the following is not essential requirement for contract

(Multiple Choice)
4.7/5
(46)

Which of the following cause of an accident can be attributed to organization?

(Multiple Choice)
4.7/5
(39)

A drawback of bar chart is that

(Multiple Choice)
4.9/5
(39)

Which of the following is/are advantages of item rate contract

(Multiple Choice)
4.9/5
(32)

CPM is

(Multiple Choice)
4.8/5
(40)

Actual performance of a task is known as

(Multiple Choice)
4.9/5
(35)

The earliest method of project planning was

(Multiple Choice)
4.9/5
(34)