Exam 8: Floods, Catchment, and Irrigation
Exam 1: Irrigation and Water Management: Part A25 Questions
Exam 2: Irrigation and Water Management: Part B25 Questions
Exam 3: Irrigation and Water Management: Part C24 Questions
Exam 4: Hydrology and Water Resources Engineering25 Questions
Exam 5: Dam Design and Spillways25 Questions
Exam 6: Hydraulic Structures and Channels25 Questions
Exam 7: River Meandering, Training and Hydroelectricity25 Questions
Exam 8: Floods, Catchment, and Irrigation25 Questions
Exam 9: Irrigation and Hydraulic Engineering25 Questions
Exam 10: Water Engineering and Irrigation Systems25 Questions
Exam 11: Canals and Irrigation25 Questions
Exam 12: Water Circulation and Irrigation25 Questions
Exam 13: Canal Design, Hydrology, and Irrigation Methods25 Questions
Exam 14: Civil Engineering Water Management25 Questions
Exam 15: Irrigation, Soil Fertility, and Water Management25 Questions
Exam 16: Water Management and Irrigation Systems21 Questions
Select questions type
To estimate the magnitude of a flood with a return period of T years, Gumbel's distribution method requires the following data pertaining to annual flood series
i. mean value
ii. standard deviation
iii. length of record
iv. coefficient of skew
The correct answer is
(Multiple Choice)
4.9/5
(31)
The peak of a 4 hour flood hydrograph is 240 m3/sec . If the rainfall excess is 80 mm and base flow which is constant is 40 m3/sec, then the peak of 4-hours unit hydrograph will be
(Multiple Choice)
4.9/5
(40)
If the demand line drawn from a ridge in a flow mass curve does not intersect the curve again, it indicates that
(Multiple Choice)
4.8/5
(39)
Which of the following methods is used to estimate flood discharge based on high water marks left over in the past ?
(Multiple Choice)
4.8/5
(38)
Showing 21 - 25 of 25