Exam 8: Floods, Catchment, and Irrigation
Exam 1: Irrigation and Water Management: Part A25 Questions
Exam 2: Irrigation and Water Management: Part B25 Questions
Exam 3: Irrigation and Water Management: Part C24 Questions
Exam 4: Hydrology and Water Resources Engineering25 Questions
Exam 5: Dam Design and Spillways25 Questions
Exam 6: Hydraulic Structures and Channels25 Questions
Exam 7: River Meandering, Training and Hydroelectricity25 Questions
Exam 8: Floods, Catchment, and Irrigation25 Questions
Exam 9: Irrigation and Hydraulic Engineering25 Questions
Exam 10: Water Engineering and Irrigation Systems25 Questions
Exam 11: Canals and Irrigation25 Questions
Exam 12: Water Circulation and Irrigation25 Questions
Exam 13: Canal Design, Hydrology, and Irrigation Methods25 Questions
Exam 14: Civil Engineering Water Management25 Questions
Exam 15: Irrigation, Soil Fertility, and Water Management25 Questions
Exam 16: Water Management and Irrigation Systems21 Questions
Select questions type
When the full supply level (F.S.L.) of the canal is much below the bed level of the drainage trough, then the cross drainage provided is called syphon aqueduct.
Free
(True/False)
4.7/5
(46)
Correct Answer:
False
The capacity of escape channel should not be less than
Free
(Multiple Choice)
4.8/5
(41)
Correct Answer:
D
For a catchment area of 120 km2, the equilibrium discharge in m3/hour of an S-curve obtained by the summation of 6 hour unit hydro graph is
(Multiple Choice)
4.8/5
(36)
In order to estimate the high flood discharge in fan-shaped catchment, the formula used is
(Multiple Choice)
4.8/5
(37)
Interception losses are due to
i. evaporation
ii. transpiration
iii. stream flow
The correct answer is
(Multiple Choice)
4.9/5
(30)
To determine the discharge at a section in a stream from its rating curve, the required data are
i. slope of water surface at the section
ii. stage at the section
iii. current meter readings at the section
The correct answer is
(Multiple Choice)
4.8/5
(47)
The whole period of cultivation from the time when irrigation water is first supplied for preparation of the ground to its last watering before harvesting, is called
(Multiple Choice)
5.0/5
(30)
The primary cause of meandering is the excess of total charge during floods, when excess of turbulence is developed.
(True/False)
4.8/5
(39)
For an annual flood series arranged in descending order of magnitude, the return for a magnitude listed at position period m in a total data N is
(Multiple Choice)
4.9/5
(38)
Instantaneous unit hydrograph is a hydrograph of
i. unit duration
ii. unit rainfall excess
iii. infinitely small duration
iv. infinitely small rainfall excess
The correct answer is
(Multiple Choice)
4.8/5
(29)
When the drain is over the canal, the structure provided is known as
(Multiple Choice)
4.8/5
(46)
If the risk of a flood occurring in the next 10 years is accepted to 10%, then the return period for design should be
(Multiple Choice)
4.8/5
(37)
A 6 hours storm had 4 cm of rainfall and the resulting runoff was 2 cm. If
(Multiple Choice)
4.9/5
(42)
The stream which does not have any base flow contribution is called
(Multiple Choice)
4.8/5
(27)
The stage of river carrying a discharge of Q m7sec at a point is 10 m and slope of water surface is (1/4000). The discharge of a flood at the same point and same stage of 10 m with a water surface slope of(l/1000)willbe
(Multiple Choice)
4.8/5
(38)
Showing 1 - 20 of 25