Exam 2: Septic Tanks, Soil Plasticity, and Structures for Water Flow
Exam 1: Construction and Costing Projects24 Questions
Exam 2: Septic Tanks, Soil Plasticity, and Structures for Water Flow25 Questions
Exam 3: Structures, Equipment, and Materials Used in Construction25 Questions
Exam 4: Construction and Software Development Project Management20 Questions
Exam 5: Construction Techniques, Reports, and Cyber Crimes25 Questions
Exam 6: Cyber-Crimes, Quotations, Tenders, and Contract Law24 Questions
Exam 7: Reverse Engineering and Cost Estimation in Construction Industry21 Questions
Select questions type
As of 2013 pit latrines are used by an estimated _____________ people.
(Multiple Choice)
4.8/5
(32)
The material retained or supported by the retaining structure is called _____________
(Multiple Choice)
4.7/5
(35)
The first chamber in a septic tank should be at least___________of the total length.
(Multiple Choice)
4.8/5
(34)
The coefficient of earth pressure when the soil is at equilibrium is _____________
(Multiple Choice)
4.9/5
(37)
The wedge-shaped portion of the backfill tending to move with the wall is called
(Multiple Choice)
4.8/5
(43)
Showing 21 - 25 of 25
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)