Exam 2: Septic Tanks, Soil Plasticity, and Structures for Water Flow

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

As of 2013 pit latrines are used by an estimated _____________    people.

(Multiple Choice)
4.8/5
(32)

The material retained or supported by the retaining structure is called _____________

(Multiple Choice)
4.7/5
(35)

The first chamber in a septic tank should be at least___________of the total length.

(Multiple Choice)
4.8/5
(34)

The coefficient of earth pressure when the soil is at equilibrium is _____________  

(Multiple Choice)
4.9/5
(37)

The wedge-shaped portion of the backfill tending to move with the wall is called

(Multiple Choice)
4.8/5
(43)
Showing 21 - 25 of 25
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)