Exam 5: Construction Techniques, Reports, and Cyber Crimes
Exam 1: Construction and Costing Projects24 Questions
Exam 2: Septic Tanks, Soil Plasticity, and Structures for Water Flow25 Questions
Exam 3: Structures, Equipment, and Materials Used in Construction25 Questions
Exam 4: Construction and Software Development Project Management20 Questions
Exam 5: Construction Techniques, Reports, and Cyber Crimes25 Questions
Exam 6: Cyber-Crimes, Quotations, Tenders, and Contract Law24 Questions
Exam 7: Reverse Engineering and Cost Estimation in Construction Industry21 Questions
Select questions type
The process of removing culverts, which is becoming increasingly prevalent, is known as
(Multiple Choice)
4.8/5
(49)
Into which of these types are formal reports not classified?
(Multiple Choice)
4.9/5
(39)
An_____________culvert is normally a low profile culvert. It allows them to be installed without disturbing the causeway as it will span over the entire drainage width.
(Multiple Choice)
4.7/5
(29)
For preparation of subgrade the existing subgrade should be dressed to a camber of 1 in 24 to 1 in 32.
(True/False)
4.7/5
(33)
Showing 21 - 25 of 25
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)