Exam 12: Strategy Implementation: Control and Performance

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

_________ is an implementation method that considers a wide variety of stakeholders in the performance of the company.

Free
(Multiple Choice)
4.9/5
(24)
Correct Answer:
Verified

B

The entire McKinsey 7-S framework is oriented around the concept of

Free
(Multiple Choice)
4.9/5
(38)
Correct Answer:
Verified

C

Perceptual measures of performance should not be used since they only indicate how a customer or supplier feels about a company's products or processes.

Free
(True/False)
4.7/5
(31)
Correct Answer:
Verified

False

The range or variation in a quantitative metric is a better and more powerful indicator of performance improvement than the average.

(True/False)
4.7/5
(32)

The results of a plan using the value-driver-action model will ideally fit on one page and include for each key value driver something that looks like this:

(Multiple Choice)
4.8/5
(38)

In the opening vignette for the chapter we are told that McDonald's reported its first-ever quarterly loss in January, 2003.

(True/False)
4.9/5
(30)

The "systems" category of the McKinsey 7-S framework includes information technology systems but also refers to

(Multiple Choice)
4.7/5
(29)

When metrics are translated to the functional level to be effective they should be connected to incentives.

(True/False)
4.9/5
(39)

"Creating a single company currency," one of the five keys to successful implementation control, refers to the idea that everyone with an acceptable level of performance or better should receive equal merit raises.

(True/False)
4.8/5
(41)

Describe the steps that are required by the value-driver-action implementation process.

(Essay)
4.9/5
(34)

The central notion of the balanced scorecard is that financial measures of performance are the result of a variety of activities in which people engage and not the cause.

(True/False)
4.8/5
(42)

If a company is using a differentiation approach, solely capturing information about efforts to reduce costs will be unproductive in allowing top management to assess whether progress is being made toward the company's important goals.

(True/False)
4.8/5
(45)

A lead metric, in the context of the balanced scorecard model, represents the observable actions of employees that the firm hopes will lead to the results it is ultimately trying to achieve.

(True/False)
4.8/5
(41)

One of the steps of the process used in the value-driver-action model requires managers to create a list of desired stakeholder experiences for each key value driver. This step specifically involves

(Multiple Choice)
4.8/5
(33)

The metrics created for each employee or level must be related to activities that are under the control of that employee or level.

(True/False)
4.7/5
(40)

________ metrics represent the results that we would hope and expect to observe for each of the subdimensions in any one perspective of a balanced scorecard.

(Multiple Choice)
4.8/5
(43)

In the value-driver-action model of implementation key value drivers are behaviors linked to the primary activities of the value chain but not behaviors that might be considered linked to support activities.

(True/False)
4.9/5
(36)

Causal logic is a concept that refers to the assessment that a manager makes about the reasons that things work the way they do.

(True/False)
4.9/5
(25)

Which of the following is not one of the tools discussed in the text for developing a strategy implementation plan?

(Multiple Choice)
4.8/5
(36)

The 7-S framework is divided into hard S's and soft S's. Hard S's include strategy, systems and

(Multiple Choice)
4.8/5
(35)
Showing 1 - 20 of 37
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)