Aggregate planning is an important supply chain issue because,to be effective,it requires inputs from throughout the supply chain,but its results have little impact on the supply chain.

Free
(True/False)
4.9/5
(31)
Correct Answer:
Verified

False

The operational parameter concerned with the subcontracted capacity required over the planning horizon is

Free
(Multiple Choice)
4.8/5
(36)
Correct Answer:
Verified

C

The strategy where a stable machine capacity and workforce are maintained with a constant output rate,with inventory levels fluctuating over time,is the

Free
(Multiple Choice)
4.9/5
(41)
Correct Answer:
Verified

C

Forecasting errors are dealt with in aggregate plans using either safety backlog or safety capacity.

(True/False)
4.8/5
(39)

The aggregate plan should be communicated to

(Multiple Choice)
4.9/5
(34)

The aggregate planner must make a trade-off between capacity,inventory,and backlog costs.

(True/False)
4.8/5
(26)

Which of the following is not a constraint the aggregate planner needs to consider?

(Multiple Choice)
4.8/5
(42)

Discuss the primary objective and operational parameters of aggregate planning.

(Essay)
4.8/5
(33)

Companies should work with downstream partners to produce forecasts and with upstream partners to determine constraints when doing aggregate planning.

(True/False)
4.9/5
(41)

Safety capacity is defined as capacity used to satisfy demand that is lower than forecasted.

(True/False)
4.9/5
(39)

To create an aggregate plan,a company must specify the planning horizon for the plan and the duration of each period within the planning horizon.

(True/False)
4.9/5
(38)

When formulating aggregate plans,

(Multiple Choice)
4.8/5
(29)

Most strategies that an aggregate planner actually uses are in combination,and are referred to as hybrid strategies.

(True/False)
4.8/5
(41)

The operational parameter concerned with the amount of overtime production planned is

(Multiple Choice)
4.8/5
(41)

Aggregate planning solves problems involving

(Multiple Choice)
4.9/5
(40)

The goal of aggregate planning is to

(Multiple Choice)
4.7/5
(39)

A planning horizon is usually between three and five years.

(True/False)
4.8/5
(41)

________ is used to determine customer service levels.

(Multiple Choice)
4.9/5
(38)

Which is not reasonable when implementing aggregate planning in practice?

(Multiple Choice)
4.8/5
(42)

As capacity utilization increases,it becomes less important to perform aggregate planning.

(True/False)
4.8/5
(36)