When the work is routine,fast-tracking rarely causes serious problems.

(True/False)
4.8/5
(33)

Allocating specific,limited resources to specific activities is called

(Multiple Choice)
4.9/5
(37)

The safety time added to chains other than the critical chain is called

(Multiple Choice)
4.8/5
(36)

Often it is beneficial to crash activities NOT on the critical path.

(True/False)
4.7/5
(29)

The variance of the normal time can be quite different from the variance of the crash time.

(True/False)
4.9/5
(31)

In general,steady state demand for human resources is highly desirable.

(True/False)
4.7/5
(43)

A resource allocation decision may be intended to avoid a future problem rather than correct a current problem.

(True/False)
4.8/5
(30)

Projects often compete with each other for the same resources.

(True/False)
4.9/5
(25)

Pools of like resources from which labor can be added temporarily to projects tend to increase costs for the firm as a whole.

(True/False)
4.8/5
(30)

Good PM are able to estimate project task times with absolute certainty

(True/False)
4.9/5
(33)

When crashing a task,the usual assumption is that a task is crashed the full amount or none at all.

(True/False)
5.0/5
(35)

Starting the building phase before the design and planning phases is called

(Multiple Choice)
4.7/5
(40)

If resources were not scarce,the resource allocation problem would be concerned solely with profit maximization.

(True/False)
4.8/5
(33)

Fast-tracking a project is used primarily in the pharmaceutical industry.

(True/False)
4.9/5
(44)

According to research,the best overall priority rule is

(Multiple Choice)
4.9/5
(28)

A limitation associated with traditional approaches to project management is that the dependency between resources and tasks is often ignored.

(True/False)
5.0/5
(41)

A task has a normal duration of 9 days and a crash duration of 7 days.Its normal cost is $40 and its crash cost is $100.What is the crash cost per day?

(Multiple Choice)
4.8/5
(33)

The task duration with standard-practice resource usage is referred to as the

(Multiple Choice)
4.8/5
(32)

Resource loading refers to the amounts of specific resources that are scheduled for use on specific activities or projects at specific times.

(True/False)
4.8/5
(39)

Which of the following priority rules makes resources available so that activities start on their LSTs whenever possible without increasing the project's duration?

(Multiple Choice)
4.8/5
(44)