A project that must be completed by a fixed time is referred to as resource constrained.
(True/False)
4.8/5
(36)
The time to complete a task with normal or standard-practice resource usage is referred to as the crash duration.
(True/False)
4.9/5
(36)
A project that must be completed with in the specified performance requirements is considered
(Multiple Choice)
4.8/5
(39)
The CPM method cannot be used when task durations are probabilistic.
(True/False)
4.8/5
(28)
Resource loading refers to the amounts of specific resources that are scheduled for use on specific activities or projects at specific times.
(True/False)
4.9/5
(49)