Exam 1: Projects and Project Management

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Constructing buildings as environmentally friendly and energy efficient as possible by using more recyclable and earth-friendly products best describes

Free
(Multiple Choice)
4.8/5
(30)
Correct Answer:
Verified

C

The project is finalized during the

Free
(Multiple Choice)
4.7/5
(38)
Correct Answer:
Verified

A

The overall quality of a project in terms of its impacts and benefits best defines

Free
(Multiple Choice)
4.9/5
(36)
Correct Answer:
Verified

C

A project is a set of activities to solve a problem or take advantage of an opportunity.

(True/False)
5.0/5
(40)

The foundation of successful projects includes each of the following except

(Multiple Choice)
4.9/5
(37)

List five potential benefits of project management.

(Essay)
4.9/5
(37)

Quality functional deployment,Kano model,and affinity diagrams are tools used during the design phase.

(True/False)
4.8/5
(40)

The discipline of project management is about providing tools and techniques to enable a project team to organize its work and meet the project success factors.

(True/False)
4.9/5
(43)

Software being coded,contracts tendered and awarded,and construction work being undertaken will generally occur during

(Multiple Choice)
4.9/5
(31)

Project failure is caused by each of the following except

(Multiple Choice)
4.9/5
(38)

The variability in the process of transformation of inputs to outputs or in the inputs themselves best defines

(Multiple Choice)
4.9/5
(32)

Complexity refers to the extent to which the items or elements upon which work is performed or the work processes themselves are interrelated.

(True/False)
4.8/5
(36)

When classified according to complexity,a public transportation system project would be classified as a

(Multiple Choice)
5.0/5
(28)

Risk management plans are an output associated with the analysis phase.

(True/False)
4.9/5
(39)

Final launch documents are an output associated with the closure phase.

(True/False)
4.8/5
(43)

The pre-feasibility study is usually used to assess whether to conduct a full feasibility study.

(True/False)
4.9/5
(42)

A clear statement of project needs is an output associated with the planning phase.

(True/False)
4.9/5
(35)

Interdependence refers to the number of products or operations that are performed at the same time and the resulting degree of difficulty.

(True/False)
4.8/5
(31)

Ensuring compliance plans occurs during the

(Multiple Choice)
4.7/5
(35)

The number of products or operations that are performed at the same time and the resulting degree of difficulty best defines

(Multiple Choice)
4.8/5
(33)
Showing 1 - 20 of 80
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)