Exam 7: Quality, Performance and Value

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

With random sampling,larger sample sizes generally lead to increased precision.

Free
(True/False)
4.7/5
(41)
Correct Answer:
Verified

True

Which of the following follows all the steps outlined in the process improvement plan in order to identify the improvements necessary to enhance the quality of a project?

Free
(Multiple Choice)
4.8/5
(27)
Correct Answer:
Verified

A

Poor design is an example of variation due to normal causes.

Free
(True/False)
4.9/5
(31)
Correct Answer:
Verified

True

ISO 9002 deals with the requirements that an organization has to fulfill in order to meet the standards and provides a model for quality assurance in design,development,production,installation,and servicing for creation of new products,services,and systems.

(True/False)
4.9/5
(40)

Quality in use is defined by

(Multiple Choice)
4.9/5
(35)

Control charts used in controlling quality include

(Multiple Choice)
4.8/5
(40)

The application of statistical methods to monitor and control a process in order to reduce variability best defines

(Multiple Choice)
4.8/5
(29)

Which of the following was defined by Edwards Deming as a predictable degree of uniformity and dependability at low cost suitable to the market?

(Multiple Choice)
4.7/5
(40)

The availability and excellence of "bells and whistles" related to a product best describes

(Multiple Choice)
4.8/5
(39)

Garvin's eight dimensions of quality include each of the following except

(Multiple Choice)
4.8/5
(31)

The profitability index is the ratio of payoff to investment of a proposed project.

(True/False)
4.8/5
(45)

ISO/IEC 9126-1 addresses a framework for software evaluation using the general characteristics of software.

(True/False)
4.8/5
(35)

Quality review methods include

(Multiple Choice)
4.9/5
(35)

The biggest challenge in managing quality is ensuring that processes are consistent.

(True/False)
4.7/5
(40)

A critical aspect of quality control and evaluates the ability of a project process to meet or exceed the expectations or preset specifications best describes

(Multiple Choice)
4.8/5
(41)

Components of quality management include

(Multiple Choice)
4.8/5
(28)

A statistical method for identifying which factors influence specific variables of a product or process and which variable has the greatest effect best describes

(Multiple Choice)
4.7/5
(42)

Quality process analysis steps include each of the following except

(Multiple Choice)
4.9/5
(35)

Identify and describe four control charts.

(Essay)
4.8/5
(35)

Define metric.In order to be widely used in an organization,what must a metric do?

(Essay)
4.8/5
(40)
Showing 1 - 20 of 80
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)