Exam 6: Systems Development: Phases, Tools, and Techniques

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following is an advantage of prototyping?

(Multiple Choice)
4.8/5
(37)

The _____ phase of the SDLC involves monitoring an information system to be sure it meets business needs.

(Short Answer)
5.0/5
(35)

_____ is the process of building a model that demonstrates the features of a proposed product,service,or system.

(Short Answer)
4.9/5
(35)

A prototype you use to convince people of the worth of a proposed system is a(n)____.

(Multiple Choice)
4.8/5
(30)

_____ are the detailed steps the system must perform along with the expected results of each step.

(Short Answer)
5.0/5
(37)

A project scope document is:

(Multiple Choice)
4.9/5
(38)

Rather than combating the trend toward end-user application development,IT staff should leverage it to offload solution building to end users.

(True/False)
4.9/5
(32)

_____ is a general approach to system development that focuses on building small self-contained blocks of code that can be reused across a variety of applications within an organization.

(Short Answer)
4.7/5
(37)

_____ outsourcing is using another company in the same country to perform IT functions.

(Short Answer)
4.7/5
(41)

A(n)_____ document clearly defines the high-level system requirements.

(Short Answer)
4.9/5
(34)

During the _____ phase of the SDLC,you build a technical blue print of how the proposed system will work.

(Short Answer)
4.9/5
(32)

_____ focuses on building small self-contained blocks of code that can be reused across a variety of applications within an organization.

(Multiple Choice)
4.8/5
(29)

_____ implementation has only a small group of people using the new system until you know it works correctly and then the remaining people are added to the system.

(Short Answer)
4.9/5
(27)

The agile methodology is similar to XP but with more focus on team coding and less on limiting project scope.

(True/False)
4.8/5
(20)

The _____ phase of the SDLC involves determining a solid plan for developing your information system.

(Short Answer)
4.9/5
(30)

End users often use tools like DBMSs and spreadsheets to develop applications for their own needs.

(True/False)
4.9/5
(30)

A(n)_____ is a formal document that describes in detail your logical requirements for a proposed system and invites outsourcing organizations to submit bids for its development.

(Short Answer)
4.8/5
(33)

_____ is the process of building a model that demonstrates the features of a proposed product,service,or system.

(Multiple Choice)
4.8/5
(37)

_____ is the activity of drawing a graphical representation of a design.

(Short Answer)
4.9/5
(31)

Which of the following is a disadvantage to prototyping?

(Multiple Choice)
4.9/5
(30)
Showing 81 - 100 of 138
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)