Exam 5: Systems Development and Program Change Activities

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A cost-benefit analysis is a part of the detailed

(Multiple Choice)
4.9/5
(43)

Mixing technologies from many vendors improves technical feasibility.

(True/False)
4.9/5
(37)

An example of a tangible benefit is

(Multiple Choice)
4.9/5
(36)

____________________ benefits can be measured and expressed in financial terms,while ____________________ benefits cannot be easily measured and/or quantified.

(Short Answer)
4.8/5
(30)

Routine maintenance activities require all of the following controls except

(Multiple Choice)
4.9/5
(39)

During the detailed feasibility study of the project,the systems professional who proposed the project should be involved in performing the study.

(True/False)
4.8/5
(44)

A commercial software system that is completely finished,tested,and ready for implementation is called a

(Multiple Choice)
4.8/5
(30)

All of the steps in the Systems Development Life Cycle apply to software that is developed in-house and to commercial software.

(True/False)
4.9/5
(40)

The role of the accountant/internal auditor in the conceptual design phase of the Systems Development Life Cycle includes all of the following except

(Multiple Choice)
4.8/5
(32)

Which statement is not correct? The structured design approach

(Multiple Choice)
4.7/5
(34)

Describe a risk associated with the phased cutover procedure for data conversion.

(Essay)
4.8/5
(41)

Intangible benefits are not physical,but can be measured and expressed in financial terms.

(True/False)
5.0/5
(40)

In the conceptual design phase of the Systems Development Life Cycle (SDLC),task force members are focused on selecting the new system design.

(True/False)
4.7/5
(42)

After the systems analysis phase of the System Development Life Cycle (SDLC)is complete,the company will have a formal systems analysis report on

(Multiple Choice)
4.8/5
(44)

The role of the steering committee includes

(Multiple Choice)
4.9/5
(35)

When preparing a cost-benefit analysis,design costs incurred in the systems planning,systems analysis and conceptual design phases of the Systems Development Life Cycle are relevant costs.

(True/False)
4.8/5
(40)

An example of an intangible benefit is

(Multiple Choice)
4.7/5
(32)

Contrast the source program library (SPL)management system to the database management system (DBMS).

(Essay)
4.9/5
(31)

Define the feasibility measures that should be considered during project analysis and give an example of each.

(Essay)
4.7/5
(39)

Which of the following is not an advantage of commercial software? Commercial software

(Multiple Choice)
4.8/5
(43)
Showing 21 - 40 of 108
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)