Exam 5: Systems Development and Program Change Activities

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Classify each of the following as either a one-time or recurring costs: training personnel initial programming and testing system design-one hardware costs software maintenance costs site preparation rent for facilities data conversion from old system to new system insurance costs installation of original equipment hardware upgrades

(Essay)
4.8/5
(32)

Describe a test of controls that would provide evidence that only authorized program maintenance is occurring.

(Essay)
4.8/5
(32)

The first step in the SDLC is to develop a systems strategy

(True/False)
4.8/5
(34)

Evaluators of the detailed feasibility study should not include

(Multiple Choice)
4.9/5
(35)

What is a systems selection report?

(Essay)
4.8/5
(36)

What are two purposes of the systems project proposal?

(Essay)
4.9/5
(39)

The detailed design report contains all of the following except

(Multiple Choice)
4.8/5
(30)

Explain the five stages of the systems development life cycle?

(Essay)
4.8/5
(36)

Which task is not essential during a data conversion procedure?

(Multiple Choice)
4.9/5
(43)

When converting to a new system,which cutover method is the most conservative?

(Multiple Choice)
4.9/5
(40)

The output of the detailed design phase of the Systems Development Life Cycle (SDLC)is a

(Multiple Choice)
4.7/5
(41)

Explain why the Systems Development Life Cycle is of interest to accountants.What is the accountant's role in the Systems Development Life Cycle?

(Essay)
4.9/5
(42)

Computer operators should have access to all of the following types of documentation except

(Multiple Choice)
4.9/5
(47)

Legal feasibility identifies conflicts between the proposed system and the company's ability to discharge its legal responsibilities

(True/False)
4.8/5
(38)

Intangible benefits

(Multiple Choice)
4.8/5
(34)

Aspects of project feasibility include all of the following except

(Multiple Choice)
4.9/5
(31)

Which step is least likely to occur when choosing a commercial software package?

(Multiple Choice)
4.8/5
(38)

Project planning includes all of the following except

(Multiple Choice)
4.8/5
(33)

An accountant's responsibility in the SDLC is to ensure that the system applies proper accounting conventions and rules and possesses adequate control.

(True/False)
4.8/5
(44)

One-time costs include operating and maintenance costs.

(True/False)
4.9/5
(44)
Showing 41 - 60 of 108
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)