Exam 9: Supplier Management and Development: Creating a World-Class Supply Base

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following is not a supplier-specific barrier to supplier development?

Free
(Multiple Choice)
4.8/5
(38)
Correct Answer:
Verified

A

A single source can never deliver cost and quality improvements over the life of a contract even if a buyer manages that supplier appropriately.

Free
(True/False)
4.9/5
(30)
Correct Answer:
Verified

False

Sustainability reflects the importance of strategic environmental practices of suppliers but not the management of social responsibility in the supply base.

Free
(True/False)
4.7/5
(36)
Correct Answer:
Verified

False

The ____ is a normalization factor for the supplier performance index that eliminates high-dollar lot bias.

(Multiple Choice)
4.9/5
(34)

If a supplier's product or service is routine,it should be considered for supplier development.

(True/False)
4.7/5
(35)

____ is any activity undertaken by a buyer to improve a supplier's performance or capabilities to meet the buyer's short- and long-term supply needs.

(Multiple Choice)
4.9/5
(34)

Which of the following is not a buyer-specific barrier to supplier development?

(Multiple Choice)
4.9/5
(45)

Which of the following is not a typical supplier development activity?

(Multiple Choice)
4.8/5
(39)

The ____ is often used when the buying organization requires a rapid reduction in the number of suppliers.

(Multiple Choice)
4.9/5
(30)

The ____ supplier evaluation system seeks to quantify the total cost of doing business with a supplier,as the lowest purchase price is not always the lowest total cost for an item or service.

(Multiple Choice)
4.7/5
(29)

Weighted-point supplier evaluation systems are very inflexible.

(True/False)
4.9/5
(37)

The buyer and the supplier must agree on how to divide or share the costs and benefits from a supplier development project.

(True/False)
4.7/5
(39)

There is only one common approach to supply base rationalization and optimization.

(True/False)
4.7/5
(37)

Maintaining small quantities of inventory has been the traditional methods of dealing with supply base risk.

(True/False)
4.8/5
(37)

In supplier measurement,the basic logic of the ____ is built around the calculation of a/an ____.

(Multiple Choice)
4.9/5
(38)

A smaller supplier with limited capacity may need to eliminate some existing customers in order to meet the increased requirements of its larger customer.

(True/False)
4.8/5
(44)

All of the following are advantages of a weighted-point supplier evaluation system except ____.

(Multiple Choice)
4.8/5
(32)

All of the following are contingency management tools that can be effectively used at the tactical level to assist the supply manager in identifying,analyzing,reducing,and monitoring supply base risk except ____.

(Multiple Choice)
4.9/5
(33)

All of the following are advantages of a cost-based supplier evaluation system except ____.

(Multiple Choice)
4.9/5
(35)

In ____,a buyer selects or develops suppliers with multiple or redundant capabilities.

(Multiple Choice)
4.7/5
(40)
Showing 1 - 20 of 84
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)