Exam 17: Acquiring and Implementing Accounting Information Systems
Exam 1: Introduction to Accounting Information Systems115 Questions
Exam 2: Enterprise Systems140 Questions
Exam 3: Electronic Business E-Business Systems113 Questions
Exam 4: Documenting Information Systems108 Questions
Exam 5: Database Management Systems180 Questions
Exam 6: Relational Databases and Sql93 Questions
Exam 7: Controlling Information Systems: Introduction to Enterprise Risk Management and Internal Control161 Questions
Exam 8: Controlling Information Systems: Introduction to Pervasive Controls157 Questions
Exam 9: Controlling Information Systems: Business Process and Application Controls126 Questions
Exam 10: The Order Entrysales Oes Process128 Questions
Exam 11: The Billingaccounts Receivable Cash Receipts Barcr Process134 Questions
Exam 12: The Purchasing Process131 Questions
Exam 13: Accounts Payablecash Disbursements Apcd Process104 Questions
Exam 14: The Human Resources Process HR Management and Payroll Processes118 Questions
Exam 15: Integrated Production Processes IPP106 Questions
Exam 16: General Ledger and Business Reporting Glbr Process78 Questions
Exam 17: Acquiring and Implementing Accounting Information Systems206 Questions
Select questions type
The cost/effectiveness study attempts to answer the question, "which alternative best accomplishes the user's goals for the system being developed?"
(True/False)
4.9/5
(34)
A(n) ____________________ is a representative user workload, processed on each vendor's proposed system configuration, to obtain comparative throughput measures.
(Short Answer)
4.8/5
(33)
After defining the requirements for the new system, the current logical DFD should be modified to reflect the components of the future system.The development team may propose logical design alternatives for the future logical system that may involve derivatives of the following except:
(Multiple Choice)
4.8/5
(29)
The direct approach is also known as the big bang or cold turkey approach.
(True/False)
4.8/5
(34)
Within the characteristics of systems development methodology, deliverables signify approval of the development process and the system being developed.
(True/False)
4.8/5
(39)
The cost/benefit study attempts to answer the question, "which alternative accomplishes the user's goals for the least cost (or greatest benefit)?"
(True/False)
4.8/5
(31)
Which of the following ranks each alternative on its relative capability to satisfy the user's requirements (goals) for the system?
(Multiple Choice)
4.9/5
(40)
The logical specifications and physical requirements become the criteria by which the user will accept the new or modified system.
(True/False)
4.8/5
(37)
Which of the following is not a reason for using a team in systems analysis?
(Multiple Choice)
4.7/5
(49)
The _________________________ verifies the new system against the original specifications.
(Short Answer)
4.9/5
(36)
____________________ maintenance is conducted to improve the performance of an application.
(Short Answer)
4.7/5
(45)
Which of the following is a characteristic of external hardware sources?
(Multiple Choice)
4.9/5
(41)
The type of maintenance that is conducted to improve the performance of an application is referred to as:
(Multiple Choice)
4.7/5
(33)
Which of the following is specified in the approved configuration plan?
(Multiple Choice)
4.7/5
(31)
An organization might request bids for computer resources from only one vendor for all of the following reasons except:
(Multiple Choice)
4.8/5
(38)
Which of the following has the task of evaluating alternative AIS solutions?
(Multiple Choice)
5.0/5
(41)
A user-directed test of the complete system in a test environment is called a(n) ____ test.
(Multiple Choice)
4.8/5
(36)
TB Figure 17.3 is taken from the text figure showing the systems selection task and documents.
Required:
Explode bubble 3.0 Systems Selection into a Level 1 DFD.The DFD should include the items listed below.The data flows for available hardware and physical requirements are listed twice because these data flows will each appear twice in the Level 1 DFD.

(Essay)
4.7/5
(31)
The modular approach forces the users to learn the new system without the old system to fall back on.
(True/False)
4.9/5
(41)