Exam 3: Measurement of Cost Behavior
Exam 1: Managerial Accounting, the Business Organization129 Questions
Exam 2: Introduction to Cost Behavior and Cost-Volume Relationships152 Questions
Exam 3: Measurement of Cost Behavior141 Questions
Exam 4: Cost Management Systems and Activity-Based Costing129 Questions
Exam 5: Relevant Information for Decision Making With a Focus128 Questions
Exam 6: Relevant Information for Decision Making With a Focus148 Questions
Exam 7: Introduction to Budgets and Preparing the Master Budget144 Questions
Exam 8: Flexible Budgets and Variance Analysis143 Questions
Exam 9: Management Control Systems and Responsibility Accounting147 Questions
Exam 10: Management Control in Decentralized Organizations160 Questions
Exam 11: Capital Budgeting141 Questions
Exam 12: Cost Allocation125 Questions
Exam 13: Accounting for Overhead Costs127 Questions
Exam 14: Job-Order Costing and Process-Costing Systems157 Questions
Exam 15: Basic Accounting: Concepts, techniques, and Conventions154 Questions
Exam 16: Understanding Corporate Annual Reports: Basic Financial Statements149 Questions
Exam 17: Understanding and Analyzing Consolidated Financial Statements122 Questions
Select questions type
The least-squares regression method can be used to approximate a cost function.A disadvantage of this method is ________.
(Multiple Choice)
4.9/5
(40)
In a linear mixed cost function,the slope of the function is the fixed cost per unit of the cost driver.
(True/False)
4.8/5
(39)
Volume-driven costs can be easily traced to products or services.
(True/False)
4.8/5
(33)
Snead currently produces 120,000 units at a cost of $400,000.Of the $400,000 cost,$200,000 is a fixed cost.Next year Snead expects to produce 145,000 units.Snead's relevant range for production activities is 100,000 to 150,000 units.If 145,000 units are produced next year,what is the expected fixed cost for next year?
(Multiple Choice)
4.8/5
(35)
Due to the economic downturn,a company has reduced charitable donations to community groups.This is an example of a ________.
(Multiple Choice)
4.9/5
(31)
To estimate or approximate cost functions,managers have a broad selection of methods that do NOT include ________.
(Multiple Choice)
4.9/5
(33)
The following data has been assembled for Tire Company.Use the high-low method.
The total fixed cost is ________.

(Multiple Choice)
4.8/5
(30)
Presented below is the production data for the first six months of the year showing the mixed costs incurred by Euclid Company.
Euclid Company uses the high-low method to analyze mixed costs.The variable cost per unit is ________.

(Multiple Choice)
4.9/5
(28)
Costs that may be essential to the long-run achievement of the organization's goals,but that managers can almost reduce to zero in the short-run,are called ________.
(Multiple Choice)
4.9/5
(32)
The Rockford Company used regression analysis to predict the annual cost of utilities.The results were as follows:
The total fixed cost is ________.

(Multiple Choice)
4.9/5
(35)
Only major changes in the scale or scope of operations can change ________ in future periods.Managers can very spending levels for ________ in the short run.
(Multiple Choice)
4.9/5
(39)
In an economic downturn,a company could temporarily reduce or eliminate a(n)________.
(Multiple Choice)
4.8/5
(35)
A telephone bill,which includes a monthly base rate plus an extra fee for each local and long-distance call is an example of a variable cost.
(True/False)
4.8/5
(35)
Wacky Bird Company,a producer of fine quality clocks,produced 5,000 clocks at a cost of $1,150,000 in July.In August,the company produced 3,000 clocks at a cost of $900,000.
Required:
A)Using the two data points,determine a cost function for Wacky Bird Company.
B)Determine the expected total cost if Wacky Bird Company produces 4,000 clocks.
(Essay)
4.8/5
(32)
An algebraic equation used by managers to describe the relationship between a cost and its cost driver(s)is called a ________.
(Multiple Choice)
4.8/5
(37)
Least-squares regression provides statistical information about the reliability of its cost estimates.
(True/False)
4.8/5
(45)
In an economic downturn,a company could temporarily reduce or eliminate a(n)________.
(Multiple Choice)
4.9/5
(30)
In engineering analysis,cost analysts estimate cost functions using ________.
(Multiple Choice)
4.9/5
(37)
When evaluating a cost function and its estimates,it is important to see if the estimated cost function makes economic sense.This is assessed by ________.