Exam 20: Introduction to Systems Development and Systems Analysis

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

________ is a form of resistance when users continue to use a manual process instead of adopting a new information system.

(Multiple Choice)
4.9/5
(44)

Companies usually accept the project with the ________ when using the payback method to determine a project's economic feasibility.

(Multiple Choice)
4.9/5
(29)

Refer to the diagram below,where the numbers next to the arrows refer to the number of days required for completion of the corresponding activity.What is the critical path? Refer to the diagram below,where the numbers next to the arrows refer to the number of days required for completion of the corresponding activity.What is the critical path?

(Multiple Choice)
4.7/5
(30)

One disadvantage of a Gantt chart is the fact that

(Multiple Choice)
4.7/5
(27)

A good rule to follow to prevent behavioral problems associated with implementing a new system is "Avoid complex systems that cause radical changes." What expression is used to describe this system design rule?

(Multiple Choice)
4.9/5
(36)

Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the internal rate of return criterion? Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the internal rate of return criterion?

(Multiple Choice)
4.8/5
(38)

The ________ is the basic building block of information systems planning.

(Multiple Choice)
4.7/5
(37)

Fairfax Corporation uses two systems for revenue cycle transaction processing.One system keeps track of customer sales.The other system keeps track of accounts receivable.Last year,Fairfax Corporation decided to merge the two systems into one so that both functions could be performed in the same system.This is an example of

(Multiple Choice)
4.9/5
(33)

What role does the information systems steering committee play in the systems development process?

(Multiple Choice)
4.9/5
(41)

Estimating future cash flows and discounting them back to the present is part of which capital budgeting technique?

(Multiple Choice)
4.7/5
(37)

Refer to the diagram below,where the numbers next to the arrows refer to the number of days required for completion of the corresponding activity.What is the critical path? Refer to the diagram below,where the numbers next to the arrows refer to the number of days required for completion of the corresponding activity.What is the critical path?

(Multiple Choice)
4.8/5
(30)

The ________ method of gathering information helps to determine how a system should work.

(Multiple Choice)
4.7/5
(33)

________ model is the basic model used to create a framework for an economic feasibility analysis.

(Multiple Choice)
4.9/5
(44)

Describe the five phases of systems analysis.

(Essay)
4.8/5
(41)

What are some of the reasons why behavioral problems occur when a new AIS is introduced?

(Essay)
4.8/5
(41)

All of the elements of the system come together in which step of the systems development life cycle?

(Multiple Choice)
4.9/5
(42)

It is most difficult to quantify ________ when assessing economic feasibility.

(Multiple Choice)
4.8/5
(39)

The most important and is frequently re-analyzed part of a feasibility study is the ________ aspect.

(Multiple Choice)
4.9/5
(37)

When seeking to find answers to question pertaining to "why," the most useful approach is to

(Multiple Choice)
4.8/5
(45)

The purpose of systems analysis is to

(Multiple Choice)
4.9/5
(34)
Showing 61 - 80 of 100
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)