Exam 19: Balanced Scorecard: Quality and Time
Exam 1: The Manager and Management Accounting195 Questions
Exam 2: An Introduction to Cost Terms and Purposes224 Questions
Exam 3: Cost-Volume-Profit Analysis208 Questions
Exam 4: Job Costing199 Questions
Exam 5: Activity-Based Costing and Activity-Based Management176 Questions
Exam 6: Master Budget and Responsibility Accounting226 Questions
Exam 7: Flexible Budgets, direct-Cost Variances, and Management Control180 Questions
Exam 8: Flexible Budgets, overhead Cost Variances, and Management Control176 Questions
Exam 9: Inventory Costing and Capacity Analysis211 Questions
Exam 10: Determining How Costs Behave190 Questions
Exam 11: Decision Making and Relevant Information218 Questions
Exam 12: Strategy, balanced Scorecard, and Strategic Profitability Analysis172 Questions
Exam 13: Pricing Decisions and Cost Management210 Questions
Exam 14: Cost Allocation, customer-Profitability Analysis, and Sales-Variance Analysis167 Questions
Exam 15: Allocation of Support-Department Costs, common Costs, and Revenues150 Questions
Exam 16: Cost Allocation: Joint Products and Byproducts151 Questions
Exam 17: Process Costing149 Questions
Exam 18: Spoilage, rework, and Scrap153 Questions
Exam 19: Balanced Scorecard: Quality and Time151 Questions
Exam 20: Inventory Management, just-In-Time, and Simplified Costing Methods151 Questions
Exam 21: Capital Budgeting and Cost Analysis151 Questions
Exam 22: Management Control Systems, transfer Pricing, and Multinational Considerations153 Questions
Exam 23: Performance Measurement, compensation, and Multinational Considerations151 Questions
Select questions type
The time from which a machine is setup for order till the product becomes a manufactured good is ________.
(Multiple Choice)
4.9/5
(40)
Answer the following questions using the information below:
Captain Carl's Seascapes produces sea pictures for sale through catalogs. The company has two workstations, photo production and framing. The photo production station is limited by the speed of operating the photo development machine. Framing is limited by the speed of the employees. Framing normally waits for work from photo production. Each department works an eight-hour day. If Captain Carl's Seascapes adds an earlier half shift so that photo production begins work four hours earlier than framing each day, the two departments generally finish their work at about the same time. Not only does this eliminate the bottleneck, but it also increases finished units produced each day by 200 units. All units produced can be sold. The cost of operating the photo production department four more hours each day is $1,250. The contribution margin of the finished products is $10 each.
-What is the total production per day if the change is made?
(Multiple Choice)
4.9/5
(40)
Cause-and-effect diagrams are used in quality management systems to ________.
(Multiple Choice)
4.9/5
(41)
Answer the following questions using the information below:
Ventaz Corp has a variable demand. Historically, its demand has ranged from 30 to 50 windows per day with an average of 40. Alex works eight hours a day, five days a week. Each order is one window and each window takes 11 minutes.
-What is the cycle time for an order?
(Multiple Choice)
4.8/5
(44)
For a fast-food restaurant,the average waiting time can be formulated as ________.
(Multiple Choice)
4.9/5
(43)
Costs of quality (COQ)reports usually consider opportunity costs.
(True/False)
4.8/5
(30)
Average reduction in setup time and processing time at bottleneck operations is an example of learning-and-growth measures to tackle bottleneck situations.
(True/False)
4.9/5
(40)
Answer the following questions using the information below:
Captain Carl's Seascapes produces sea pictures for sale through catalogs. The company has two workstations, photo production and framing. The photo production station is limited by the speed of operating the photo development machine. Framing is limited by the speed of the employees. Framing normally waits for work from photo production. Each department works an eight-hour day. If Captain Carl's Seascapes adds an earlier half shift so that photo production begins work four hours earlier than framing each day, the two departments generally finish their work at about the same time. Not only does this eliminate the bottleneck, but it also increases finished units produced each day by 200 units. All units produced can be sold. The cost of operating the photo production department four more hours each day is $1,250. The contribution margin of the finished products is $10 each.
-What is the change in the daily contribution margin if the change is made?
(Multiple Choice)
4.9/5
(35)
An on-time delivery rate is considered a nonfinancial measure of customer satisfaction.
(True/False)
4.7/5
(34)
ISO 9000 are standards designed to encourage organizations to develop environmental management systems to reduce environmental costs.
(True/False)
4.7/5
(35)
COQ reports provide more insight about quality improvements and allow managers to compare
trends over time.
(True/False)
4.9/5
(41)
Brown Laundry has a variable demand.The daily demand ranges from 100 to 140 customers a day with an average of 5 items.The average daily demand is 110 customers.The laundry operates 10 hours a day.Each order takes approximately 5 minutes.
Required:
a.What is the average customer waiting time,in minutes?
b.What is the cycle time for an order?
c.The manager has decided that the waiting time is too long and has increased the workday to 11 hours.What is the waiting time now? Will the customers be any happier?
(Essay)
4.8/5
(30)
Acme Janitor Service has always taken pride in the fact that it had one of the highest customer response times in the home cleaning service industry.However,as the products manufactured for this industry have become more complex,the company's customer response time has declined.
Required:
Why do you think that response time declined if all other quality factors have remained the same?
(Essay)
4.9/5
(40)
Tony placed an order for a customized watch.The customer response time is 36 hours,its receipt time is 8 hours,and manufacturing cycle time is 24 hours.Calculate the delivery time of the product.
(Multiple Choice)
4.9/5
(25)
Answer the following questions using the information below:
LaCrosse Products has a budget of $900,000 in 2015 for prevention costs. If it decides to automate a portion of its prevention activities, it will save $80,000 in variable costs. The new method will require $40,000 in training costs and $100,000 in annual equipment costs. Management is willing to adjust the budget for an amount up to the cost of the new equipment. The budgeted production level is 150,000 units.
Appraisal costs for the year are budgeted at $600,000. The new prevention procedures will save appraisal costs of $50,000. Internal failure costs average $15 per failed unit of finished goods. The internal failure rate is expected to be 3% of all completed items. The proposed changes will cut the internal failure rate by one-third. Internal failure units are destroyed. External failure costs average $54 per failed unit. The company's average external failures average 3% of units sold. The new proposal will reduce this rate by 50%. Assume all units produced are sold and there are no ending inventories.
-What is the net change in the budget for prevention costs if the procedures are automated in 2015? Will management agree with the changes?
(Multiple Choice)